YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Geotechnical and Geoenvironmental Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Investigation into the Internal Erosion and Local Settlement of Esfarayen Earth-Fill Dam

    Source: Journal of Geotechnical and Geoenvironmental Engineering:;2020:;Volume ( 146 ):;issue: 004
    Author:
    Seyyed Kazem Razavi
    ,
    Masoud Hajialilue Bonab
    ,
    Ahmad Dabaghian
    DOI: 10.1061/(ASCE)GT.1943-5606.0002216
    Publisher: ASCE
    Abstract: A considerable sudden settlement was discovered on the Esfarayen Earth-fill Dam surface near to the left abutment when the reservoir level rose to 51 m from the riverbed in April 2013. As a result, a detection process was prepared to comprehend the problem and relevant challenges required to consider devising an appropriate remedial work. For this purpose, the work was divided into three main parts: (1) analyzing the information gathered from the monitoring and surveillance plan, (2) performing a geotechnical site investigation to test the subsurface condition and the extent of the problem, and (3) finding the cause of the problem initiation by considering three aspects—the bedrock geological condition, material susceptibility, and three-dimensional numerical modeling. The outcomes from the different parts of the study categorized the problem as an internal erosion incident. The existence of an inadequate sealed crushed zone of a fault passing through the reservoir on the contact surface with the clay core was the major cause of the internal erosion initiation. The water, appearing through this narrow crushed zone, applied additional hydrostatic pressure on the clay core, which depended on the reservoir level and had no influence on the stress distribution inside the dam. With the water pressure exceeding the minor principal total stress, a crack formed and extended with time, turning to a large void. Because of the high quality of the clay core material and its well-designed downstream filter, the internal erosion progression was concentrated on the core and directed to the upstream. When it reached the upstream filter, the filter entered into the core, and the material from the overlying part of the dam repeatedly dropped, resulting in a final settlement on the dam surface. The numerical modeling was successful in the determination of the approximate time of the internal erosion initiation by considering the past loading history of the dam and the influence of the existing defect.
    • Download: (5.557Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Investigation into the Internal Erosion and Local Settlement of Esfarayen Earth-Fill Dam

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265767
    Collections
    • Journal of Geotechnical and Geoenvironmental Engineering

    Show full item record

    contributor authorSeyyed Kazem Razavi
    contributor authorMasoud Hajialilue Bonab
    contributor authorAhmad Dabaghian
    date accessioned2022-01-30T19:40:25Z
    date available2022-01-30T19:40:25Z
    date issued2020
    identifier other%28ASCE%29GT.1943-5606.0002216.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265767
    description abstractA considerable sudden settlement was discovered on the Esfarayen Earth-fill Dam surface near to the left abutment when the reservoir level rose to 51 m from the riverbed in April 2013. As a result, a detection process was prepared to comprehend the problem and relevant challenges required to consider devising an appropriate remedial work. For this purpose, the work was divided into three main parts: (1) analyzing the information gathered from the monitoring and surveillance plan, (2) performing a geotechnical site investigation to test the subsurface condition and the extent of the problem, and (3) finding the cause of the problem initiation by considering three aspects—the bedrock geological condition, material susceptibility, and three-dimensional numerical modeling. The outcomes from the different parts of the study categorized the problem as an internal erosion incident. The existence of an inadequate sealed crushed zone of a fault passing through the reservoir on the contact surface with the clay core was the major cause of the internal erosion initiation. The water, appearing through this narrow crushed zone, applied additional hydrostatic pressure on the clay core, which depended on the reservoir level and had no influence on the stress distribution inside the dam. With the water pressure exceeding the minor principal total stress, a crack formed and extended with time, turning to a large void. Because of the high quality of the clay core material and its well-designed downstream filter, the internal erosion progression was concentrated on the core and directed to the upstream. When it reached the upstream filter, the filter entered into the core, and the material from the overlying part of the dam repeatedly dropped, resulting in a final settlement on the dam surface. The numerical modeling was successful in the determination of the approximate time of the internal erosion initiation by considering the past loading history of the dam and the influence of the existing defect.
    publisherASCE
    titleInvestigation into the Internal Erosion and Local Settlement of Esfarayen Earth-Fill Dam
    typeJournal Paper
    journal volume146
    journal issue4
    journal titleJournal of Geotechnical and Geoenvironmental Engineering
    identifier doi10.1061/(ASCE)GT.1943-5606.0002216
    page04020006
    treeJournal of Geotechnical and Geoenvironmental Engineering:;2020:;Volume ( 146 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian