contributor author | Mingzheng Wang; Xiuzhi Shi; Jian Zhou | |
date accessioned | 2019-03-10T11:59:48Z | |
date available | 2019-03-10T11:59:48Z | |
date issued | 2019 | |
identifier other | %28ASCE%29CF.1943-5509.0001263.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4254610 | |
description abstract | A new optimization method for optimal charge scheme calculation is proposed to reduce undesired phenomenon in ring blasting, including brow damage, overcrushing, and bulking yield, which are caused by the unreasonable distribution of blasting energy. First, all the feasible charge schemes are calculated by a traversal algorithm. Then fragment size value is predicted according to the blasting simulation program, which is based on a modified Harries mathematical model. Finally, the optimal charge scheme is selected by the X50 and X90−X10 of fragment size value of the muck pile. The program is developed by Visual LISP on the AutoCAD platform. A case study illustrates the optimization procedure, and some field tests were conducted in Tonglvshan copper mine and Fankou mine to verify the feasibility of the program. The optimization method can play a positive role in brow protection. It can also obviously improve the muck pile fragment-size distribution. | |
publisher | American Society of Civil Engineers | |
title | Optimal Charge Scheme Calculation for Multiring Blasting Using Modified Harries Mathematical Model | |
type | Journal Paper | |
journal volume | 33 | |
journal issue | 2 | |
journal title | Journal of Performance of Constructed Facilities | |
identifier doi | 10.1061/(ASCE)CF.1943-5509.0001263 | |
page | 04019002 | |
tree | Journal of Performance of Constructed Facilities:;2019:;Volume ( 033 ):;issue: 002 | |
contenttype | Fulltext | |