description abstractA new optimization method for optimal charge scheme calculation is proposed to reduce undesired phenomenon in ring blasting, including brow damage, overcrushing, and bulking yield, which are caused by the unreasonable distribution of blasting energy. First, all the feasible charge schemes are calculated by a traversal algorithm. Then fragment size value is predicted according to the blasting simulation program, which is based on a modified Harries mathematical model. Finally, the optimal charge scheme is selected by the X50 and X90−X10 of fragment size value of the muck pile. The program is developed by Visual LISP on the AutoCAD platform. A case study illustrates the optimization procedure, and some field tests were conducted in Tonglvshan copper mine and Fankou mine to verify the feasibility of the program. The optimization method can play a positive role in brow protection. It can also obviously improve the muck pile fragment-size distribution.
publisherAmerican Society of Civil Engineers
titleOptimal Charge Scheme Calculation for Multiring Blasting Using Modified Harries Mathematical Model
typeJournal Paper
journal volume33
journal issue2
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0001263
page04019002
treeJournal of Performance of Constructed Facilities:;2019:;Volume ( 033 ):;issue: 002