YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects

    Source: Journal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
    Author:
    Jesper Kranker Larsen
    ,
    Geoffrey Qiping Shen
    ,
    Søren Munch Lindhard
    ,
    Thomas Ditlev Brunoe
    DOI: 10.1061/(ASCE)ME.1943-5479.0000391
    Publisher: American Society of Civil Engineers
    Abstract: As a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman’s test. Wilcoxon’s test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
    • Download: (144.7Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4243758
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorJesper Kranker Larsen
    contributor authorGeoffrey Qiping Shen
    contributor authorSøren Munch Lindhard
    contributor authorThomas Ditlev Brunoe
    date accessioned2017-12-30T12:56:50Z
    date available2017-12-30T12:56:50Z
    date issued2016
    identifier other%28ASCE%29ME.1943-5479.0000391.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243758
    description abstractAs a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman’s test. Wilcoxon’s test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
    publisherAmerican Society of Civil Engineers
    titleFactors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
    typeJournal Paper
    journal volume32
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)ME.1943-5479.0000391
    page04015032
    treeJournal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian