Show simple item record

contributor authorJesper Kranker Larsen
contributor authorGeoffrey Qiping Shen
contributor authorSøren Munch Lindhard
contributor authorThomas Ditlev Brunoe
date accessioned2017-12-30T12:56:50Z
date available2017-12-30T12:56:50Z
date issued2016
identifier other%28ASCE%29ME.1943-5479.0000391.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243758
description abstractAs a result of the loss of financial resources and the need to optimize projects, academics, politicians, and the construction industry have become increasingly aware of the challenges presented by the frequent time and cost overruns and reduced quality of construction projects. The purpose of this study was to analyze the factors that project managers experience as having the greatest effect on time, cost, and quality, and to discover whether the effects of these factors are significantly different from each other. A questionnaire with 26 factors identified from interviews was sent to the full population of publicly employed project managers. Factors were ranked using the relative importance index and tested for significant differences using Friedman’s test. Wilcoxon’s test was used in a post-hoc analysis. From the findings it was determined that the most influential factor for time is unsettled or lack of project funding; for cost, errors or omissions in consultant material; and for quality, errors or omissions in construction work. The main conclusion of this research is that project schedule, budget, and quality level are affected in significantly different ways. Therefore, a project manager cannot handle such critical issues by focusing only on schedule or budget complications; nor can he or she assume that time, cost, and quality are equally affected.
publisherAmerican Society of Civil Engineers
titleFactors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects
typeJournal Paper
journal volume32
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000391
page04015032
treeJournal of Management in Engineering:;2016:;Volume ( 032 ):;issue: 001
contenttypeFulltext