YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Energy Resources Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Research on Underground Dynamic Fluid Pressure Balance in the Process of Oil Shale In-Situ Fracturing-Nitrogen Injection Exploitation

    Source: Journal of Energy Resources Technology:;2017:;volume( 139 ):;issue: 003::page 32908
    Author:
    Chen, Chen
    ,
    Gao, Shuai
    ,
    Sun, Youhong
    ,
    Guo, Wei
    ,
    Li, Qiang
    DOI: 10.1115/1.4035748
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Oil shale in-situ retorting is a reasonable development technology. However, the ground water may flow into fractures in oil shale layer that impact the process of oil shale in-situ retorting. This paper introduced oil shale in-situ fracturing-nitrogen injection exploitation and a method of dynamic pressure balance between the ground water and high pressure nitrogen to keep the oil shale layer without ground water in the process of oil shale in-situ fracturing-nitrogen injection exploitation. Theoretical basis of dynamic pressure balance between ground water and nitrogen was established through analyzing pressure relationship between ground water and nitrogen in the fractures and field experiment was conducted according to the method. The field experiment results showed that nitrogen pressure maintained high level in the fractures during the stage of building pressure balance of nitrogen and ground water and pushed ground water out of the oil shale layer. Then, nitrogen pressure in the fractures reduced and maintained stable because part of nitrogen in the fractures flowed out from the production well and flow conductivity of fractures enhanced. After the balance between the ground water and high pressure nitrogen was established, water yield of production well reduced more than 85%. It explained that the balance has function of sealing up.
    • Download: (825.0Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Research on Underground Dynamic Fluid Pressure Balance in the Process of Oil Shale In-Situ Fracturing-Nitrogen Injection Exploitation

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4236941
    Collections
    • Journal of Energy Resources Technology

    Show full item record

    contributor authorChen, Chen
    contributor authorGao, Shuai
    contributor authorSun, Youhong
    contributor authorGuo, Wei
    contributor authorLi, Qiang
    date accessioned2017-11-25T07:21:11Z
    date available2017-11-25T07:21:11Z
    date copyright2017/8/2
    date issued2017
    identifier issn0195-0738
    identifier otherjert_139_03_032908.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4236941
    description abstractOil shale in-situ retorting is a reasonable development technology. However, the ground water may flow into fractures in oil shale layer that impact the process of oil shale in-situ retorting. This paper introduced oil shale in-situ fracturing-nitrogen injection exploitation and a method of dynamic pressure balance between the ground water and high pressure nitrogen to keep the oil shale layer without ground water in the process of oil shale in-situ fracturing-nitrogen injection exploitation. Theoretical basis of dynamic pressure balance between ground water and nitrogen was established through analyzing pressure relationship between ground water and nitrogen in the fractures and field experiment was conducted according to the method. The field experiment results showed that nitrogen pressure maintained high level in the fractures during the stage of building pressure balance of nitrogen and ground water and pushed ground water out of the oil shale layer. Then, nitrogen pressure in the fractures reduced and maintained stable because part of nitrogen in the fractures flowed out from the production well and flow conductivity of fractures enhanced. After the balance between the ground water and high pressure nitrogen was established, water yield of production well reduced more than 85%. It explained that the balance has function of sealing up.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleResearch on Underground Dynamic Fluid Pressure Balance in the Process of Oil Shale In-Situ Fracturing-Nitrogen Injection Exploitation
    typeJournal Paper
    journal volume139
    journal issue3
    journal titleJournal of Energy Resources Technology
    identifier doi10.1115/1.4035748
    journal fristpage32908
    journal lastpage032908-7
    treeJournal of Energy Resources Technology:;2017:;volume( 139 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian