YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Offshore Mechanics and Arctic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique

    Source: Journal of Offshore Mechanics and Arctic Engineering:;2017:;volume( 139 ):;issue: 002::page 21302
    Author:
    Kim, Sung-Kyoon
    ,
    Roh, Myung-Il
    ,
    Kim, Ki-Su
    DOI: 10.1115/1.4035141
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: An offshore platform has several modules that contain much of the equipment needed for oil and gas production, and these are placed on the limited space of the topside. Furthermore, the equipment layout should leave sufficient space in between to ensure operability, maintainability, and safety. Thus, the design problem to arrange the topside of an offshore platform can be difficult to solve due to the number of modules and equipment placed on the topside. This study proposes a method to arrange the offshore topside based on an expert system and multistage optimization in order to obtain the optimal arrangement that addresses various considerations and satisfies the given requirements. The proposed method consists of four components. First, an expert system is proposed to systematically computerize experts' knowledge and experience and to evaluate the feasibility of alternatives for the arrangement of the offshore topside. Second, a multistage optimization method is proposed to yield a better arrangement design by formulating the arrangement design problem as an optimization problem with two stages. Third, an arrangement template model (ATM) was proposed to store the arrangement data of the offshore topside. Fourth, the user interface was developed to run the expert system and for optimization. A prototype program was then developed to solve an floating, production, storage, and offloading (FPSO) topside problem in order to evaluate the applicability of the proposed method. The results showed that the proposed method can be used to obtain the optimal arrangement of an offshore topside.
    • Download: (6.253Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4235445
    Collections
    • Journal of Offshore Mechanics and Arctic Engineering

    Show full item record

    contributor authorKim, Sung-Kyoon
    contributor authorRoh, Myung-Il
    contributor authorKim, Ki-Su
    date accessioned2017-11-25T07:18:50Z
    date available2017-11-25T07:18:50Z
    date copyright2017/13/2
    date issued2017
    identifier issn0892-7219
    identifier otheromae_139_02_021302.pdf
    identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4235445
    description abstractAn offshore platform has several modules that contain much of the equipment needed for oil and gas production, and these are placed on the limited space of the topside. Furthermore, the equipment layout should leave sufficient space in between to ensure operability, maintainability, and safety. Thus, the design problem to arrange the topside of an offshore platform can be difficult to solve due to the number of modules and equipment placed on the topside. This study proposes a method to arrange the offshore topside based on an expert system and multistage optimization in order to obtain the optimal arrangement that addresses various considerations and satisfies the given requirements. The proposed method consists of four components. First, an expert system is proposed to systematically computerize experts' knowledge and experience and to evaluate the feasibility of alternatives for the arrangement of the offshore topside. Second, a multistage optimization method is proposed to yield a better arrangement design by formulating the arrangement design problem as an optimization problem with two stages. Third, an arrangement template model (ATM) was proposed to store the arrangement data of the offshore topside. Fourth, the user interface was developed to run the expert system and for optimization. A prototype program was then developed to solve an floating, production, storage, and offloading (FPSO) topside problem in order to evaluate the applicability of the proposed method. The results showed that the proposed method can be used to obtain the optimal arrangement of an offshore topside.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleArrangement Method of Offshore Topside Based on an Expert System and Optimization Technique
    typeJournal Paper
    journal volume139
    journal issue2
    journal titleJournal of Offshore Mechanics and Arctic Engineering
    identifier doi10.1115/1.4035141
    journal fristpage21302
    journal lastpage021302-19
    treeJournal of Offshore Mechanics and Arctic Engineering:;2017:;volume( 139 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian