Show simple item record

contributor authorNellippallil, Anand Balu
contributor authorSong, Kevin N.
contributor authorGoh, Chung-Hyun
contributor authorZagade, Pramod
contributor authorGautham, B. P.
contributor authorAllen, Janet K.
contributor authorMistree, Farrokh
date accessioned2017-11-25T07:18:02Z
date available2017-11-25T07:18:02Z
date copyright2017/19/1
date issued2017
identifier issn1050-0472
identifier othermd_139_03_031403.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4234928
description abstractThe steel manufacturing process is characterized by the requirement of expeditious development of high quality products at low cost through the effective use of available resources. Identifying solutions that meet the conflicting commercially imperative goals of such process chains is hard using traditional search techniques. The complexity in such a problem increases due to the presence of a large number of design variables, constraints and bounds, conflicting goals and the complex sequential relationships of the different stages of manufacturing. A classic example of such a manufacturing problem is the design of a rolling system for manufacturing a steel rod. This is a sequential process in which information flows from first rolling stage/pass to the last rolling pass and the decisions made at first pass influence the decisions that are made at the later passes. In this context, we define horizontal integration as the facilitation of information flow from one stage to another thereby establishing the integration of manufacturing stages to realize the end product. In this paper, we present an inverse design method based on well-established empirical models and response surface models developed through simulation experiments (finite-element based) along with the compromise decision support problem (cDSP) construct to support integrated information flow across different stages of a multistage hot rod rolling system. The method is goal-oriented because the design decisions are first made based on the end requirements identified for the process at the last rolling pass and these decisions are then passed to the preceding rolling passes following the sequential order in an inverse manner to design the entire rolling process chain to achieve the horizontal integration of stages. We illustrate the efficacy of the method by carrying out the design of a multistage rolling system. We formulate the cDSP for the second and fourth pass of a four pass rolling chain. The stages are designed by sequentially passing the design information obtained after exercising the cDSP for the last pass for different scenarios and identifying the best combination of design variables that satisfies the conflicting goals. The cDSP for the second pass helps in integrated information flow from fourth to first pass and in meeting specified goals imposed by the fourth and third passes. The end goals identified for this problem for the fourth pass are minimization of ovality (quality) of rod, maximization of throughput (productivity), and minimization of rolling load (performance and cost). The method can be instantiated for other multistage manufacturing processes such as the steel making process chain having several unit operations.
publisherThe American Society of Mechanical Engineers (ASME)
titleA Goal-Oriented, Sequential, Inverse Design Method for the Horizontal Integration of a Multistage Hot Rod Rolling System
typeJournal Paper
journal volume139
journal issue3
journal titleJournal of Mechanical Design
identifier doi10.1115/1.4035555
journal fristpage31403
journal lastpage031403-16
treeJournal of Mechanical Design:;2017:;volume( 139 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record