YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Water Resources Planning and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Heuristic Branch-and-Bound Method for Ground Water Development Planning

    Source: Journal of Water Resources Planning and Management:;1998:;Volume ( 124 ):;issue: 003
    Author:
    Bancha Kwanyuen
    ,
    Darrell G. Fontane
    DOI: 10.1061/(ASCE)0733-9496(1998)124:3(140)
    Publisher: American Society of Civil Engineers
    Abstract: A ground water development planning problem considering the minimization of both fixed installation and variable operation costs is formulated using the response matrix method. This mixed integer, nonlinear problem is solved using penalty coefficient (PC) methods, the pseudointeger method (PIM), and a heuristic branch-and-bound (HBB) method. An HBB technique was developed based upon combining the concepts of the branch-and-bound method with heuristic knowledge about the potential pumping yield of pumping cells. All methods were applied to test problems and their performance compared using accuracy, computation time, and memory requirements as criteria. Although the HBB method was not as computationally efficient as the other methods, it was more robust in finding the optimal solution, particularly for problems with more than three time periods. The HBB method was applied for long-term multiobjective planning to the Sukhothai Groundwater Project in Thailand. The problem was solved using multiobjective analysis based upon a combination of the ε-constraint method and compromise programming.
    • Download: (1.188Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Heuristic Branch-and-Bound Method for Ground Water Development Planning

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/39525
    Collections
    • Journal of Water Resources Planning and Management

    Show full item record

    contributor authorBancha Kwanyuen
    contributor authorDarrell G. Fontane
    date accessioned2017-05-08T21:07:26Z
    date available2017-05-08T21:07:26Z
    date copyrightMay 1998
    date issued1998
    identifier other%28asce%290733-9496%281998%29124%3A3%28140%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/39525
    description abstractA ground water development planning problem considering the minimization of both fixed installation and variable operation costs is formulated using the response matrix method. This mixed integer, nonlinear problem is solved using penalty coefficient (PC) methods, the pseudointeger method (PIM), and a heuristic branch-and-bound (HBB) method. An HBB technique was developed based upon combining the concepts of the branch-and-bound method with heuristic knowledge about the potential pumping yield of pumping cells. All methods were applied to test problems and their performance compared using accuracy, computation time, and memory requirements as criteria. Although the HBB method was not as computationally efficient as the other methods, it was more robust in finding the optimal solution, particularly for problems with more than three time periods. The HBB method was applied for long-term multiobjective planning to the Sukhothai Groundwater Project in Thailand. The problem was solved using multiobjective analysis based upon a combination of the ε-constraint method and compromise programming.
    publisherAmerican Society of Civil Engineers
    titleHeuristic Branch-and-Bound Method for Ground Water Development Planning
    typeJournal Paper
    journal volume124
    journal issue3
    journal titleJournal of Water Resources Planning and Management
    identifier doi10.1061/(ASCE)0733-9496(1998)124:3(140)
    treeJournal of Water Resources Planning and Management:;1998:;Volume ( 124 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian