YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Study of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand

    Source: Journal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 001
    Author:
    Thanapun Prasertrungruang
    ,
    B. H. Hadikusumo
    DOI: 10.1061/(ASCE)0733-9364(2009)135:1(2)
    Publisher: American Society of Civil Engineers
    Abstract: Downtime resulting from machine breakdown invariably has a considerable impact on the performance of construction projects and companies as a whole, especially to contractors with heavy investment in equipment. Attempts to investigate the causes and consequences of downtime are rarely found. The aim of this paper is to characterize and quantify factors that influence downtime consequences (consequential problems resulting from downtime) of highway construction equipment based on the structural equation modeling (SEM) approach. A questionnaire survey was conducted to collect data on equipment management practices and downtime consequences among highway contractors in Thailand. The SEM model proposed is of value for both researchers and practitioners to facilitate a better understanding of the relationships among acquisition condition, operational practice, maintenance quality, disposal practice, and downtime consequence of heavy equipment. The model also helps contractors to manage equipment more efficiently by concentrating on several practices that can convey the greatest benefit in minimizing downtime consequences at each particular stage of a machine’s life cycle, rather than considering all practices simultaneously where the benefits gained are perhaps not proportional to the effort.
    • Download: (145.6Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Study of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28830
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorThanapun Prasertrungruang
    contributor authorB. H. Hadikusumo
    date accessioned2017-05-08T20:50:21Z
    date available2017-05-08T20:50:21Z
    date copyrightJanuary 2009
    date issued2009
    identifier other%28asce%290733-9364%282009%29135%3A1%282%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28830
    description abstractDowntime resulting from machine breakdown invariably has a considerable impact on the performance of construction projects and companies as a whole, especially to contractors with heavy investment in equipment. Attempts to investigate the causes and consequences of downtime are rarely found. The aim of this paper is to characterize and quantify factors that influence downtime consequences (consequential problems resulting from downtime) of highway construction equipment based on the structural equation modeling (SEM) approach. A questionnaire survey was conducted to collect data on equipment management practices and downtime consequences among highway contractors in Thailand. The SEM model proposed is of value for both researchers and practitioners to facilitate a better understanding of the relationships among acquisition condition, operational practice, maintenance quality, disposal practice, and downtime consequence of heavy equipment. The model also helps contractors to manage equipment more efficiently by concentrating on several practices that can convey the greatest benefit in minimizing downtime consequences at each particular stage of a machine’s life cycle, rather than considering all practices simultaneously where the benefits gained are perhaps not proportional to the effort.
    publisherAmerican Society of Civil Engineers
    titleStudy of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand
    typeJournal Paper
    journal volume135
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2009)135:1(2)
    treeJournal of Construction Engineering and Management:;2009:;Volume ( 135 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian