YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Comparative Study of the Variables in Construction Project Briefing/Architectural Programming

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 002
    Author:
    Ann T. W. Yu
    ,
    Qiping Shen
    ,
    John Kelly
    ,
    Kirsty Hunter
    DOI: 10.1061/(ASCE)0733-9364(2008)134:2(122)
    Publisher: American Society of Civil Engineers
    Abstract: Briefing is the process by which client requirements are identified, clarified, and articulated in the early design stage of construction projects. It is crucial to the successful delivery of construction projects. Considerable research has been conducted in briefing during the past two decades. However, researchers consider many current briefing practices to be inadequate, and little research has been done in sufficient depth to explore briefing variables in the construction industry. This paper introduces a comprehensive framework of the variables that have an impact on construction project briefing. A questionnaire survey was conducted to validate these variables among project managers and architects in Hong Kong, the United Kingdom, and the United States. The results indicate that although no significant differences existed between the samples in the United Kingdom and the United States on the variables for construction project briefing, the views of the samples in Hong Kong deviated from the two Western countries. The Western professionals have more positive answers to most statements in the questionnaire. The findings have significant implications for industry practitioners in producing their guidelines for the briefing process and for writers in drafting how-to briefing guide for construction projects.
    • Download: (442.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Comparative Study of the Variables in Construction Project Briefing/Architectural Programming

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28031
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAnn T. W. Yu
    contributor authorQiping Shen
    contributor authorJohn Kelly
    contributor authorKirsty Hunter
    date accessioned2017-05-08T20:49:08Z
    date available2017-05-08T20:49:08Z
    date copyrightFebruary 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A2%28122%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28031
    description abstractBriefing is the process by which client requirements are identified, clarified, and articulated in the early design stage of construction projects. It is crucial to the successful delivery of construction projects. Considerable research has been conducted in briefing during the past two decades. However, researchers consider many current briefing practices to be inadequate, and little research has been done in sufficient depth to explore briefing variables in the construction industry. This paper introduces a comprehensive framework of the variables that have an impact on construction project briefing. A questionnaire survey was conducted to validate these variables among project managers and architects in Hong Kong, the United Kingdom, and the United States. The results indicate that although no significant differences existed between the samples in the United Kingdom and the United States on the variables for construction project briefing, the views of the samples in Hong Kong deviated from the two Western countries. The Western professionals have more positive answers to most statements in the questionnaire. The findings have significant implications for industry practitioners in producing their guidelines for the briefing process and for writers in drafting how-to briefing guide for construction projects.
    publisherAmerican Society of Civil Engineers
    titleComparative Study of the Variables in Construction Project Briefing/Architectural Programming
    typeJournal Paper
    journal volume134
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:2(122)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian