YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001
    Author:
    Önder Ökmen
    ,
    Ahmet Öztaş
    DOI: 10.1061/(ASCE)0733-9364(2008)134:1(49)
    Publisher: American Society of Civil Engineers
    Abstract: Schedules are the means of determining project duration accurately, controlling project progress, and allocating resources efficiently in managing construction projects. It is not sufficient in today’s conditions to evaluate the construction schedules that are affected widely by risks, uncertainties, unexpected situations, deviations, and surprises with well-known deterministic or probabilistic methods such as the critical path method, bar chart (Gantt chart), line of balance, or program evaluation and review technique. In this regard, this paper presents a new simulation-based model—the correlated schedule risk analysis model (CSRAM)—to evaluate construction activity networks under uncertainty when activity durations and risk factors are correlated. An example of a CSRAM application to a single-story house project is presented in the paper. The findings of this application show that CSRAM operates well and produces realistic results in capturing correlation indirectly between activity durations and risk factors regarding the extent of uncertainty inherent in the schedule.
    • Download: (164.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27653
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorÖnder Ökmen
    contributor authorAhmet Öztaş
    date accessioned2017-05-08T20:48:08Z
    date available2017-05-08T20:48:08Z
    date copyrightJanuary 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A1%2849%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27653
    description abstractSchedules are the means of determining project duration accurately, controlling project progress, and allocating resources efficiently in managing construction projects. It is not sufficient in today’s conditions to evaluate the construction schedules that are affected widely by risks, uncertainties, unexpected situations, deviations, and surprises with well-known deterministic or probabilistic methods such as the critical path method, bar chart (Gantt chart), line of balance, or program evaluation and review technique. In this regard, this paper presents a new simulation-based model—the correlated schedule risk analysis model (CSRAM)—to evaluate construction activity networks under uncertainty when activity durations and risk factors are correlated. An example of a CSRAM application to a single-story house project is presented in the paper. The findings of this application show that CSRAM operates well and produces realistic results in capturing correlation indirectly between activity durations and risk factors regarding the extent of uncertainty inherent in the schedule.
    publisherAmerican Society of Civil Engineers
    titleConstruction Project Network Evaluation with Correlated Schedule Risk Analysis Model
    typeJournal Paper
    journal volume134
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:1(49)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian