YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Cost Information Model for Managing Multiple Projects

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 012
    Author:
    Chul S. Kim
    ,
    Liang Y. Liu
    DOI: 10.1061/(ASCE)0733-9364(2007)133:12(966)
    Publisher: American Society of Civil Engineers
    Abstract: Construction companies must deal with several projects at once, but a system to manage multiple projects is not fully developed yet. The first step towards developing such system is to design an information model that is suitable for managing multiple projects. This paper presents the cost-based project modeling (CBPM) method in contrast to the traditional activity-based project modeling methods. The CBPM uses
    • Download: (1.456Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Cost Information Model for Managing Multiple Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26786
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorChul S. Kim
    contributor authorLiang Y. Liu
    date accessioned2017-05-08T20:46:36Z
    date available2017-05-08T20:46:36Z
    date copyrightDecember 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A12%28966%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26786
    description abstractConstruction companies must deal with several projects at once, but a system to manage multiple projects is not fully developed yet. The first step towards developing such system is to design an information model that is suitable for managing multiple projects. This paper presents the cost-based project modeling (CBPM) method in contrast to the traditional activity-based project modeling methods. The CBPM uses
    publisherAmerican Society of Civil Engineers
    titleCost Information Model for Managing Multiple Projects
    typeJournal Paper
    journal volume133
    journal issue12
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:12(966)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 012
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian