Show simple item record

contributor authorChul S. Kim
contributor authorLiang Y. Liu
date accessioned2017-05-08T20:46:36Z
date available2017-05-08T20:46:36Z
date copyrightDecember 2007
date issued2007
identifier other%28asce%290733-9364%282007%29133%3A12%28966%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26786
description abstractConstruction companies must deal with several projects at once, but a system to manage multiple projects is not fully developed yet. The first step towards developing such system is to design an information model that is suitable for managing multiple projects. This paper presents the cost-based project modeling (CBPM) method in contrast to the traditional activity-based project modeling methods. The CBPM uses
publisherAmerican Society of Civil Engineers
titleCost Information Model for Managing Multiple Projects
typeJournal Paper
journal volume133
journal issue12
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2007)133:12(966)
treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record