YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Hydraulic Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea

    Source: Journal of Hydraulic Engineering:;2008:;Volume ( 134 ):;issue: 011
    Author:
    S. K. Park
    ,
    P. Y. Julien
    ,
    U. Ji
    ,
    J. F. Ruff
    DOI: 10.1061/(ASCE)0733-9429(2008)134:11(1639)
    Publisher: American Society of Civil Engineers
    Abstract: The Gupo Bridge crosses the Nakdong River near the city of Busan, South Korea. During Typhoon Maemi in 2003, the old Gupo Bridge collapsed due to excessive pier scour. More recently, the highway construction on the left-bank floodplain required right-bank channel widening to restore the channel flood-carrying capacity. This
    • Download: (2.084Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Case Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/26411
    Collections
    • Journal of Hydraulic Engineering

    Show full item record

    contributor authorS. K. Park
    contributor authorP. Y. Julien
    contributor authorU. Ji
    contributor authorJ. F. Ruff
    date accessioned2017-05-08T20:45:57Z
    date available2017-05-08T20:45:57Z
    date copyrightNovember 2008
    date issued2008
    identifier other%28asce%290733-9429%282008%29134%3A11%281639%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26411
    description abstractThe Gupo Bridge crosses the Nakdong River near the city of Busan, South Korea. During Typhoon Maemi in 2003, the old Gupo Bridge collapsed due to excessive pier scour. More recently, the highway construction on the left-bank floodplain required right-bank channel widening to restore the channel flood-carrying capacity. This
    publisherAmerican Society of Civil Engineers
    titleCase Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
    typeJournal Paper
    journal volume134
    journal issue11
    journal titleJournal of Hydraulic Engineering
    identifier doi10.1061/(ASCE)0733-9429(2008)134:11(1639)
    treeJournal of Hydraulic Engineering:;2008:;Volume ( 134 ):;issue: 011
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian