Show simple item record

contributor authorS. K. Park
contributor authorP. Y. Julien
contributor authorU. Ji
contributor authorJ. F. Ruff
date accessioned2017-05-08T20:45:57Z
date available2017-05-08T20:45:57Z
date copyrightNovember 2008
date issued2008
identifier other%28asce%290733-9429%282008%29134%3A11%281639%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26411
description abstractThe Gupo Bridge crosses the Nakdong River near the city of Busan, South Korea. During Typhoon Maemi in 2003, the old Gupo Bridge collapsed due to excessive pier scour. More recently, the highway construction on the left-bank floodplain required right-bank channel widening to restore the channel flood-carrying capacity. This
publisherAmerican Society of Civil Engineers
titleCase Study: Retrofitting Large Bridge Piers on the Nakdong River, South Korea
typeJournal Paper
journal volume134
journal issue11
journal titleJournal of Hydraulic Engineering
identifier doi10.1061/(ASCE)0733-9429(2008)134:11(1639)
treeJournal of Hydraulic Engineering:;2008:;Volume ( 134 ):;issue: 011
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record