YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 003
    Author:
    Hong Zhang
    ,
    Heng Li
    ,
    C. M. Tam
    DOI: 10.1061/(ASCE)0733-9364(2006)132:3(259)
    Publisher: American Society of Civil Engineers
    Abstract: This paper introduces a particle swarm optimization (PSO)-based methodology to implement preemptive scheduling under break and resource-constraints (PSBRC) for construction projects. The PSBRC under study allows the preemptive activities to be interrupted in off-working time and not to resume immediately in the next working period because all the limited resources are to be reallocated during a break. The potential solution to the PSBRC, i.e., a set of priorities deciding the order to start the activities or restart the interrupted activities, is represented by the multidimensional particle position. Hence PSO is applied to search for the optimal schedule for the PSBRC, in which a parallel scheme is adopted to transform the particle-represented priorities to a schedule. Computational analyses are presented to verify the effectiveness of the proposed methodology. This paper provides an attempt to make use of preemption and break for the resource-constrained construction project with the objective of minimizing project duration.
    • Download: (286.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Particle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/25364
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorHong Zhang
    contributor authorHeng Li
    contributor authorC. M. Tam
    date accessioned2017-05-08T20:44:18Z
    date available2017-05-08T20:44:18Z
    date copyrightMarch 2006
    date issued2006
    identifier other%28asce%290733-9364%282006%29132%3A3%28259%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/25364
    description abstractThis paper introduces a particle swarm optimization (PSO)-based methodology to implement preemptive scheduling under break and resource-constraints (PSBRC) for construction projects. The PSBRC under study allows the preemptive activities to be interrupted in off-working time and not to resume immediately in the next working period because all the limited resources are to be reallocated during a break. The potential solution to the PSBRC, i.e., a set of priorities deciding the order to start the activities or restart the interrupted activities, is represented by the multidimensional particle position. Hence PSO is applied to search for the optimal schedule for the PSBRC, in which a parallel scheme is adopted to transform the particle-represented priorities to a schedule. Computational analyses are presented to verify the effectiveness of the proposed methodology. This paper provides an attempt to make use of preemption and break for the resource-constrained construction project with the objective of minimizing project duration.
    publisherAmerican Society of Civil Engineers
    titleParticle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
    typeJournal Paper
    journal volume132
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2006)132:3(259)
    treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian