description abstractThis paper introduces a particle swarm optimization (PSO)-based methodology to implement preemptive scheduling under break and resource-constraints (PSBRC) for construction projects. The PSBRC under study allows the preemptive activities to be interrupted in off-working time and not to resume immediately in the next working period because all the limited resources are to be reallocated during a break. The potential solution to the PSBRC, i.e., a set of priorities deciding the order to start the activities or restart the interrupted activities, is represented by the multidimensional particle position. Hence PSO is applied to search for the optimal schedule for the PSBRC, in which a parallel scheme is adopted to transform the particle-represented priorities to a schedule. Computational analyses are presented to verify the effectiveness of the proposed methodology. This paper provides an attempt to make use of preemption and break for the resource-constrained construction project with the objective of minimizing project duration.
publisherAmerican Society of Civil Engineers
titleParticle Swarm Optimization for Preemptive Scheduling under Break and Resource-Constraints
typeJournal Paper
journal volume132
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2006)132:3(259)
treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record