YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Benefit-Cost Metrics for Design Coordination of Mechanical, Electrical, and Plumbing Systems in Multistory Buildings

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 008
    Author:
    David R. Riley
    ,
    Priya Varadan
    ,
    Jennifer S. James
    ,
    H. Randolph Thomas
    DOI: 10.1061/(ASCE)0733-9364(2005)131:8(877)
    Publisher: American Society of Civil Engineers
    Abstract: Design coordination of mechanical, electrical, and plumbing (MEP) systems in buildings is a multidisciplinary effort to locate equipment, route distribution systems, and resolve interferences between systems that can cause field conflicts. Absent from existing research are defined metrics of design coordination—how much it costs to perform depending on project variables, and the true costs of field conflicts that are eliminated by coordination. This research was performed to explore the costs of design coordination in concert with the benefits of eliminating coordination conflicts that arise in the field. A standard method to measure costs of coordination is developed for case study projects. Potential variables that affect this cost are evaluated, and the negative impacts of field conflicts are measured. Project variables that have strong relationships with coordination costs are identified to be MEP density [MEP cost/square foot (SF)], and plenum height, and exploratory models to predict coordination costs using these variables are presented. Three distinct types of coordination conflicts are identified with measurable increasing impacts and cost. These results help to quantify the level of effort needed to coordinate building systems, and help to provide a basis for detecting projects that are likely to have problematic MEP coordination processes.
    • Download: (319.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Benefit-Cost Metrics for Design Coordination of Mechanical, Electrical, and Plumbing Systems in Multistory Buildings

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/24409
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorDavid R. Riley
    contributor authorPriya Varadan
    contributor authorJennifer S. James
    contributor authorH. Randolph Thomas
    date accessioned2017-05-08T20:42:46Z
    date available2017-05-08T20:42:46Z
    date copyrightAugust 2005
    date issued2005
    identifier other%28asce%290733-9364%282005%29131%3A8%28877%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/24409
    description abstractDesign coordination of mechanical, electrical, and plumbing (MEP) systems in buildings is a multidisciplinary effort to locate equipment, route distribution systems, and resolve interferences between systems that can cause field conflicts. Absent from existing research are defined metrics of design coordination—how much it costs to perform depending on project variables, and the true costs of field conflicts that are eliminated by coordination. This research was performed to explore the costs of design coordination in concert with the benefits of eliminating coordination conflicts that arise in the field. A standard method to measure costs of coordination is developed for case study projects. Potential variables that affect this cost are evaluated, and the negative impacts of field conflicts are measured. Project variables that have strong relationships with coordination costs are identified to be MEP density [MEP cost/square foot (SF)], and plenum height, and exploratory models to predict coordination costs using these variables are presented. Three distinct types of coordination conflicts are identified with measurable increasing impacts and cost. These results help to quantify the level of effort needed to coordinate building systems, and help to provide a basis for detecting projects that are likely to have problematic MEP coordination processes.
    publisherAmerican Society of Civil Engineers
    titleBenefit-Cost Metrics for Design Coordination of Mechanical, Electrical, and Plumbing Systems in Multistory Buildings
    typeJournal Paper
    journal volume131
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2005)131:8(877)
    treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian