YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 003
    Author:
    Leroy J. Isidore
    ,
    W. Edward Back
    DOI: 10.1061/(ASCE)0733-9364(2002)128:3(211)
    Publisher: American Society of Civil Engineers
    Abstract: One of the major goals of the construction industry today is the quantification and minimization of the risk associated with construction engineering performance. When specifically considering the planning of construction projects, one way to control risk is through the development of reliable project cost estimates and schedules. Two techniques available for achieving this goal are range estimating and probabilistic scheduling. This paper looks at the integration of these techniques as a means of further controlling the risk inherent in the undertaking of construction projects. Least-squares linear regression is first considered as a means of relating the data obtained from the application of these techniques. However, because of various limitations, the application of linear regression was not considered the most appropriate means of relating the results of range estimating and probabilistic scheduling. Integration of these techniques was, therefore, achieved through the development of a new procedure called the multiple simulation analysis technique. This new procedure combines the results of range estimating and probabilistic scheduling in order to quantify the relationship existing between them. Having the ability to accurately quantify this relationship enables the selection of high percentile level values for the project cost estimate and schedule simultaneously.
    • Download: (139.2Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Multiple Simulation Analysis for Probabilistic Cost and Schedule Integration

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20042
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorLeroy J. Isidore
    contributor authorW. Edward Back
    date accessioned2017-05-08T20:34:32Z
    date available2017-05-08T20:34:32Z
    date copyrightJune 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A3%28211%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20042
    description abstractOne of the major goals of the construction industry today is the quantification and minimization of the risk associated with construction engineering performance. When specifically considering the planning of construction projects, one way to control risk is through the development of reliable project cost estimates and schedules. Two techniques available for achieving this goal are range estimating and probabilistic scheduling. This paper looks at the integration of these techniques as a means of further controlling the risk inherent in the undertaking of construction projects. Least-squares linear regression is first considered as a means of relating the data obtained from the application of these techniques. However, because of various limitations, the application of linear regression was not considered the most appropriate means of relating the results of range estimating and probabilistic scheduling. Integration of these techniques was, therefore, achieved through the development of a new procedure called the multiple simulation analysis technique. This new procedure combines the results of range estimating and probabilistic scheduling in order to quantify the relationship existing between them. Having the ability to accurately quantify this relationship enables the selection of high percentile level values for the project cost estimate and schedule simultaneously.
    publisherAmerican Society of Civil Engineers
    titleMultiple Simulation Analysis for Probabilistic Cost and Schedule Integration
    typeJournal Paper
    journal volume128
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:3(211)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian