YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    •   YE&T Library
    • ASME
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic

    Source: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering:;2015:;volume( 001 ):;issue: 003::page 31006
    Author:
    Abdollahzadeh, Gholamreza
    ,
    Rastgoo, Sima
    DOI: 10.1115/1.4030779
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: In this paper, interruption risk in construction activities of bridge projects is assessed in order to identify the main causes of its occurrence and also to determine the potential outcomes resulted from the risk occurrence. To do this, fault tree and event tree analysis (ETA) methods are applied. As the application of the traditional approach of these two methods is difficult in many cases due to limited access to information, fuzzy arithmetic can be considered as a useful tool. In this research, first, fault tree structure is created according to consequences resulted from the Delphi method. Then, the probability of risk occurrence is calculated by applying fault tree analysis (FTA) based on fuzzy logic. By establishing the structure of fault tree related to the failure risk of mitigation strategies, the main causes relating to failure of strategies are identified. The structure of the event tree is created using the obtained results; moreover, the expected monetary value (EMV) of risk event is computed. Finally, to validate the results obtained, a model is created by Monte Carlo simulation and then the results obtained by applying the two methods are compared. The EMV of the risk event evaluated in this paper is determined to be 9.93% of the project baseline cost.
    • Download: (3.118Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/156881
    Collections
    • ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering

    Show full item record

    contributor authorAbdollahzadeh, Gholamreza
    contributor authorRastgoo, Sima
    date accessioned2017-05-09T01:14:27Z
    date available2017-05-09T01:14:27Z
    date issued2015
    identifier issn2332-9017
    identifier otherRISK_1_3_031006.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/156881
    description abstractIn this paper, interruption risk in construction activities of bridge projects is assessed in order to identify the main causes of its occurrence and also to determine the potential outcomes resulted from the risk occurrence. To do this, fault tree and event tree analysis (ETA) methods are applied. As the application of the traditional approach of these two methods is difficult in many cases due to limited access to information, fuzzy arithmetic can be considered as a useful tool. In this research, first, fault tree structure is created according to consequences resulted from the Delphi method. Then, the probability of risk occurrence is calculated by applying fault tree analysis (FTA) based on fuzzy logic. By establishing the structure of fault tree related to the failure risk of mitigation strategies, the main causes relating to failure of strategies are identified. The structure of the event tree is created using the obtained results; moreover, the expected monetary value (EMV) of risk event is computed. Finally, to validate the results obtained, a model is created by Monte Carlo simulation and then the results obtained by applying the two methods are compared. The EMV of the risk event evaluated in this paper is determined to be 9.93% of the project baseline cost.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleRisk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic
    typeJournal Paper
    journal volume1
    journal issue3
    journal titleASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering
    identifier doi10.1115/1.4030779
    journal fristpage31006
    journal lastpage31006
    treeASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B: Mechanical Engineering:;2015:;volume( 001 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian