YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Leak Before Break Under Beyond Design Basis Seismic Loading

    Source: Journal of Pressure Vessel Technology:;2013:;volume( 135 ):;issue: 005::page 51801
    Author:
    Zhang, Tao
    ,
    Brust, Frederick W.
    ,
    Wilkowski, Gery
    ,
    Xu, Heqin
    ,
    Betervide, Alfredo A.
    ,
    Mazzantini, Oscar
    DOI: 10.1115/1.4024442
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The Atucha II nuclear power plant is a unique pressurized heavy water reactor (PHWR) being constructed in Argentina. The original plant design was by Kraftwerk Union (KWU) in the 1970's using the German methodology of break preclusion. The plant construction was halted for several decades, but a recent need for power was the driver for restarting the construction. The United States Nuclear Regulatory Commission (US NRC) developed leakbeforebreak (LBB) procedures in standard review plan (SRP) 3.6.3 Revision 1 for the purpose of eliminating the need to design for dynamic effects that allowed the elimination of pipe whip restraints and jet impingement shields. This SRP was originally written in 1987. The US NRC is currently developing a draft Regulatory Guide on what is called the transition break size (TBS). However, modeling crack pipe response in large complex primary piping systems under seismic loading is a difficult analysis challenge due to many factors. The initial published work (Wilkowski et al., “Robust LBB Analysis for Atucha II Nuclear Plant,â€‌ 2011 ASME PVP Conference, July 17–21, Baltimore, MD) on the seismic evaluations for the Atucha II plant showed that even with a seismic event with the amplitudes corresponding to the amplitudes for an event with a probability of 1 أ— 10−6 per year, that a doubleended guillotine break (DEGB) was pragmatically impossible due to the high leakage rates and total loss of makeup water inventory. The critical circumferential throughwall flaw size in that case was 94% of the circumference. This paper discusses further efforts to show how much higher the applied accelerations would have to be to cause a DEGB for an initial circumferential throughwall crack that was 33% around the circumference. This flaw length would also be easily detected by leakage and loss of makeup water inventory. These analyses showed that the applied seismic peakground accelerations had to exceed 25 g's for the case of this throughwallcrack to become a DEGB during a single seismic loading event. This is a factor of 80 times higher than the 1 أ— 10−6 seismic event accelerations, or 240 times higher than the safe shutdown earthquake (SSE) accelerations.
    • Download: (3.090Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Leak Before Break Under Beyond Design Basis Seismic Loading

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/153095
    Collections
    • Journal of Pressure Vessel Technology

    Show full item record

    contributor authorZhang, Tao
    contributor authorBrust, Frederick W.
    contributor authorWilkowski, Gery
    contributor authorXu, Heqin
    contributor authorBetervide, Alfredo A.
    contributor authorMazzantini, Oscar
    date accessioned2017-05-09T01:02:27Z
    date available2017-05-09T01:02:27Z
    date issued2013
    identifier issn0094-9930
    identifier otherpvt_135_05_051801.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/153095
    description abstractThe Atucha II nuclear power plant is a unique pressurized heavy water reactor (PHWR) being constructed in Argentina. The original plant design was by Kraftwerk Union (KWU) in the 1970's using the German methodology of break preclusion. The plant construction was halted for several decades, but a recent need for power was the driver for restarting the construction. The United States Nuclear Regulatory Commission (US NRC) developed leakbeforebreak (LBB) procedures in standard review plan (SRP) 3.6.3 Revision 1 for the purpose of eliminating the need to design for dynamic effects that allowed the elimination of pipe whip restraints and jet impingement shields. This SRP was originally written in 1987. The US NRC is currently developing a draft Regulatory Guide on what is called the transition break size (TBS). However, modeling crack pipe response in large complex primary piping systems under seismic loading is a difficult analysis challenge due to many factors. The initial published work (Wilkowski et al., “Robust LBB Analysis for Atucha II Nuclear Plant,â€‌ 2011 ASME PVP Conference, July 17–21, Baltimore, MD) on the seismic evaluations for the Atucha II plant showed that even with a seismic event with the amplitudes corresponding to the amplitudes for an event with a probability of 1 أ— 10−6 per year, that a doubleended guillotine break (DEGB) was pragmatically impossible due to the high leakage rates and total loss of makeup water inventory. The critical circumferential throughwall flaw size in that case was 94% of the circumference. This paper discusses further efforts to show how much higher the applied accelerations would have to be to cause a DEGB for an initial circumferential throughwall crack that was 33% around the circumference. This flaw length would also be easily detected by leakage and loss of makeup water inventory. These analyses showed that the applied seismic peakground accelerations had to exceed 25 g's for the case of this throughwallcrack to become a DEGB during a single seismic loading event. This is a factor of 80 times higher than the 1 أ— 10−6 seismic event accelerations, or 240 times higher than the safe shutdown earthquake (SSE) accelerations.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleLeak Before Break Under Beyond Design Basis Seismic Loading
    typeJournal Paper
    journal volume135
    journal issue5
    journal titleJournal of Pressure Vessel Technology
    identifier doi10.1115/1.4024442
    journal fristpage51801
    journal lastpage51801
    identifier eissn1528-8978
    treeJournal of Pressure Vessel Technology:;2013:;volume( 135 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian