YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method

    Source: Journal of Pressure Vessel Technology:;2012:;volume( 134 ):;issue: 002::page 21702
    Author:
    Chunsheng Miao
    ,
    Jianping Zhao
    DOI: 10.1115/1.4004625
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: Based on the statistical analysis from a great deal of failure cases, generally, the failure causes of buried pipeline can be classified into four factors, namely, third-party damage, erosion–corrosion damage, design and construction error, and incorrect operation. The factors influencing the failure of pipeline are complicated, varied and fuzzy. Especially, the influence factors of third-party damage of buried pipeline are of the character of fuzziness, which are difficult to express with the accurate mathematic models. In this paper, the failure factors of buried gas pipeline are first analyzed by fault tree analysis method. Then, the failure likelihood and failure consequence, two parts of the risk, are evaluated with fuzzy comprehensive assessment method, respectively. Finally, the in-service risk of the buried gas pipeline for a certain city is expressed by the risk matrix, which is established with the failure likelihood as vertical ordinate and the failure consequence as horizontal ordinate. It is concluded that there are two pipeline units belong to high risk category, 24 pipeline units belong to medium-high risk category, 160 pipeline units belong to medium risk category, and 392 pipeline units belong to low risk category.
    keyword(s): Corrosion , Pipelines , Cities , Failure , Design , Risk analysis , Errors AND Pipes ,
    • Download: (1.077Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Risk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/150160
    Collections
    • Journal of Pressure Vessel Technology

    Show full item record

    contributor authorChunsheng Miao
    contributor authorJianping Zhao
    date accessioned2017-05-09T00:54:11Z
    date available2017-05-09T00:54:11Z
    date copyrightApril, 2012
    date issued2012
    identifier issn0094-9930
    identifier otherJPVTAS-28561#021702_1.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/150160
    description abstractBased on the statistical analysis from a great deal of failure cases, generally, the failure causes of buried pipeline can be classified into four factors, namely, third-party damage, erosion–corrosion damage, design and construction error, and incorrect operation. The factors influencing the failure of pipeline are complicated, varied and fuzzy. Especially, the influence factors of third-party damage of buried pipeline are of the character of fuzziness, which are difficult to express with the accurate mathematic models. In this paper, the failure factors of buried gas pipeline are first analyzed by fault tree analysis method. Then, the failure likelihood and failure consequence, two parts of the risk, are evaluated with fuzzy comprehensive assessment method, respectively. Finally, the in-service risk of the buried gas pipeline for a certain city is expressed by the risk matrix, which is established with the failure likelihood as vertical ordinate and the failure consequence as horizontal ordinate. It is concluded that there are two pipeline units belong to high risk category, 24 pipeline units belong to medium-high risk category, 160 pipeline units belong to medium risk category, and 392 pipeline units belong to low risk category.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleRisk Analysis for the Urban Buried Gas Pipeline With Fuzzy Comprehensive Assessment Method
    typeJournal Paper
    journal volume134
    journal issue2
    journal titleJournal of Pressure Vessel Technology
    identifier doi10.1115/1.4004625
    journal fristpage21702
    identifier eissn1528-8978
    keywordsCorrosion
    keywordsPipelines
    keywordsCities
    keywordsFailure
    keywordsDesign
    keywordsRisk analysis
    keywordsErrors AND Pipes
    treeJournal of Pressure Vessel Technology:;2012:;volume( 134 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian