YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    •   YE&T Library
    • ASME
    • Journal of Pressure Vessel Technology
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique

    Source: Journal of Pressure Vessel Technology:;2012:;volume( 134 ):;issue: 006::page 61601
    Author:
    Robert E. Gross
    ,
    Emily M. Mitchell
    ,
    Stephen P. Harris
    DOI: 10.1115/1.4005940
    Publisher: The American Society of Mechanical Engineers (ASME)
    Abstract: The Savannah River Site (SRS) spring-operated relief valve (SORV) maintenance intervals were evaluated using the American Petroleum Institute’s (API) inspection updating approach in API RP 581 for Risk-Based Inspection (RBI) technology. In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating. Initial Weibull parameter estimates were updated using SRS’s historical proof test records contained in the Center for Chemical Process Safety Process Equipment Reliability Database. The API RP 581 methodology was used to estimate the SORV’s probability of failing on demand and the annual expected risk. An illustration of the inspection costs versus the associated risks is provided. Current practices are reviewed, and recommendations are made for extending maintenance intervals. A cost-effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.
    keyword(s): Inspection , Maintenance , Valves , American Petroleum Institute , Probability , Failure , Relief valves AND Springs ,
    • Download: (1.454Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/150059
    Collections
    • Journal of Pressure Vessel Technology

    Show full item record

    contributor authorRobert E. Gross
    contributor authorEmily M. Mitchell
    contributor authorStephen P. Harris
    date accessioned2017-05-09T00:53:55Z
    date available2017-05-09T00:53:55Z
    date copyright41244
    date issued2012
    identifier issn0094-9930
    identifier otherJPVTAS-926532#pvt_134_6_061601.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/150059
    description abstractThe Savannah River Site (SRS) spring-operated relief valve (SORV) maintenance intervals were evaluated using the American Petroleum Institute’s (API) inspection updating approach in API RP 581 for Risk-Based Inspection (RBI) technology. In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating. Initial Weibull parameter estimates were updated using SRS’s historical proof test records contained in the Center for Chemical Process Safety Process Equipment Reliability Database. The API RP 581 methodology was used to estimate the SORV’s probability of failing on demand and the annual expected risk. An illustration of the inspection costs versus the associated risks is provided. Current practices are reviewed, and recommendations are made for extending maintenance intervals. A cost-effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.
    publisherThe American Society of Mechanical Engineers (ASME)
    titleEvaluation of Maintenance Intervals for Spring-Operated Relief Valves Using a Risk-Based Inspection Technique
    typeJournal Paper
    journal volume134
    journal issue6
    journal titleJournal of Pressure Vessel Technology
    identifier doi10.1115/1.4005940
    journal fristpage61601
    identifier eissn1528-8978
    keywordsInspection
    keywordsMaintenance
    keywordsValves
    keywordsAmerican Petroleum Institute
    keywordsProbability
    keywordsFailure
    keywordsRelief valves AND Springs
    treeJournal of Pressure Vessel Technology:;2012:;volume( 134 ):;issue: 006
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian