description abstractMethods for correcting data from gas turbine acceptance testing are discussed, focusing on matters which are not sufficiently covered by existing standards. First a brief outline is presented of the reasoning on which correction curves are based. Typical performance correction curves are shown together with the method of calculating mass flow rate and turbine inlet temperature from test data. A procedure for verifying guarantee data at a specific operating point is then given. Operation with water injection is then considered. Ways of correcting performance data are proposed, and the reasoning of following such a procedure is discussed. Corrections for water amount as well as power and efficiency are discussed. Data from actual gas turbine testing are used to demonstrate how the proposed procedure can be applied in actual cases of acceptance testing.
publisherThe American Society of Mechanical Engineers (ASME)
titleGas Turbine Test Parameters Corrections Including Operation With Water Injection
typeJournal Paper
journal volume126
journal issue2
journal titleJournal of Engineering for Gas Turbines and Power
identifier doi10.1115/1.1691443
journal fristpage334
journal lastpage341
identifier eissn0742-4795
keywordsFlow (Dynamics)
keywordsTemperature
keywordsGas turbines
keywordsTesting
keywordsTurbines
keywordsUnderground injection
keywordsWater
keywordsStress
keywordsEngines
keywordsFuels
keywordsCompressors AND Heat
treeJournal of Engineering for Gas Turbines and Power:;2004:;volume( 126 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record