| contributor author | Chang-Xue (Jack) Feng | |
| contributor author | Andrew Kusiak | |
| contributor author | Chun-Che Huang | |
| date accessioned | 2017-05-08T23:54:03Z | |
| date available | 2017-05-08T23:54:03Z | |
| date copyright | November, 1997 | |
| date issued | 1997 | |
| identifier issn | 1087-1357 | |
| identifier other | JMSEFK-27304#571_1.pdf | |
| identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/119009 | |
| description abstract | The reduction of setup time has a significant impact on shortening manufacturing cycle time. In this paper, characteristics of setup activities are investigated, and models for sequencing setup activities are discussed. Sequencing setup activities can be modeled as a project scheduling problem. Two basic linear programming models for scheduling setup activities are presented. The models minimize the setup time (in particular, the internal setup time), and make a trade-off between the time and cost of setup activities with limited machining resources and budget. Factorial analysis is used to provide insights into the minimization of internal setup time. | |
| publisher | The American Society of Mechanical Engineers (ASME) | |
| title | Scheduling Models for Setup Reduction | |
| type | Journal Paper | |
| journal volume | 119 | |
| journal issue | 4A | |
| journal title | Journal of Manufacturing Science and Engineering | |
| identifier doi | 10.1115/1.2831189 | |
| journal fristpage | 571 | |
| journal lastpage | 579 | |
| identifier eissn | 1528-8935 | |
| keywords | Machining | |
| keywords | Manufacturing | |
| keywords | Cycles AND Linear programming | |
| tree | Journal of Manufacturing Science and Engineering:;1997:;volume( 119 ):;issue: 4A | |
| contenttype | Fulltext | |