Show simple item record

contributor authorAlfred J. Cavallo
date accessioned2017-05-08T23:48:14Z
date available2017-05-08T23:48:14Z
date copyrightMay, 1995
date issued1995
identifier issn0199-6231
identifier otherJSEEDO-28255#137_1.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/115932
description abstractWind-generated electricity can be fundamentally transformed from an intermittent resource to a baseload power supply. For the case of long distance transmission of wind electricity, this change can be achieved at a negligible increase or even a decrease in per unit cost of electricity. The economic and technical feasibility of this process can be illustrated by studying the example of a wind farm located in central Kansas and a 2000 km, 2000 megawatt transmission line to southern California. Such a system can have capacity factor of 60 percent, with no economic penalty and without storage. With compressed air energy storage (CAES) (and with a negligible economic penalty), capacity factors of 70–95 percent can be achieved. This strategy has important implications for the development of wind energy throughout the world since good wind resources are usually located far from major demand centers.
publisherThe American Society of Mechanical Engineers (ASME)
titleHigh-Capacity Factor Wind Energy Systems
typeJournal Paper
journal volume117
journal issue2
journal titleJournal of Solar Energy Engineering
identifier doi10.1115/1.2870843
journal fristpage137
journal lastpage143
identifier eissn1528-8986
keywordsWind energy systems
treeJournal of Solar Energy Engineering:;1995:;volume( 117 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record