Verification of an Elastic Procedure to Estimate Elastic Follow-UpSource: Journal of Pressure Vessel Technology:;1986:;volume( 108 ):;issue: 004::page 461Author:A. K. Dhalla
DOI: 10.1115/1.3264813Publisher: The American Society of Mechanical Engineers (ASME)
Abstract: This paper presents a simplified elastic procedure to estimate the amount of elastic follow-up due to thermal expansion stress experienced by a large diameter (greater than 200 mm) thin-walled (d /t greater than 30) piping system. The simplified method utilizes the concept of reduced elastic modulus which was successfully applied to classify clamp-induced pipe stresses into primary and secondary categories. The conservatism of the simplified method in quantifying elastic follow-up is illustrated in this paper by comparing the numerical estimate of elastic follow-up with that obtained from a detailed creep analysis of a Liquid Metal Fast Breeder Reactor piping system.
keyword(s): Creep , Stress , Clamps (Tools) , Thermal stresses , Pipes , Elastic moduli , Piping systems AND Liquid metal fast breeder reactors ,
|
Collections
Show full item record
contributor author | A. K. Dhalla | |
date accessioned | 2017-05-08T23:23:08Z | |
date available | 2017-05-08T23:23:08Z | |
date copyright | November, 1986 | |
date issued | 1986 | |
identifier issn | 0094-9930 | |
identifier other | JPVTAS-28277#461_1.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/101523 | |
description abstract | This paper presents a simplified elastic procedure to estimate the amount of elastic follow-up due to thermal expansion stress experienced by a large diameter (greater than 200 mm) thin-walled (d /t greater than 30) piping system. The simplified method utilizes the concept of reduced elastic modulus which was successfully applied to classify clamp-induced pipe stresses into primary and secondary categories. The conservatism of the simplified method in quantifying elastic follow-up is illustrated in this paper by comparing the numerical estimate of elastic follow-up with that obtained from a detailed creep analysis of a Liquid Metal Fast Breeder Reactor piping system. | |
publisher | The American Society of Mechanical Engineers (ASME) | |
title | Verification of an Elastic Procedure to Estimate Elastic Follow-Up | |
type | Journal Paper | |
journal volume | 108 | |
journal issue | 4 | |
journal title | Journal of Pressure Vessel Technology | |
identifier doi | 10.1115/1.3264813 | |
journal fristpage | 461 | |
journal lastpage | 469 | |
identifier eissn | 1528-8978 | |
keywords | Creep | |
keywords | Stress | |
keywords | Clamps (Tools) | |
keywords | Thermal stresses | |
keywords | Pipes | |
keywords | Elastic moduli | |
keywords | Piping systems AND Liquid metal fast breeder reactors | |
tree | Journal of Pressure Vessel Technology:;1986:;volume( 108 ):;issue: 004 | |
contenttype | Fulltext |