Risk Propagation in Multilayer Heterogeneous Network of Coupled System of Large Engineering Project
Publisher: ASCE
Abstract: Because of the long duration, multiplicity of technical disciplines, large number of project stakeholders, and high levels of complexity and uncertainty, project risk propagation control in large engineering projects (LEPs) ...
Novel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project
Publisher: ASCE
Abstract: The uncertain construction of hydropower projects and fierce market competition put forward more stringent requirements for contractors with regard to accuracy and competitiveness of cost estimation. However, previous ...