YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Novel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 008
    Author:
    Yun Chen
    ,
    Shu Chen
    ,
    Chaoran Hu
    ,
    Lianghai Jin
    ,
    Xiazhong Zheng
    DOI: 10.1061/(ASCE)CO.1943-7862.0001893
    Publisher: ASCE
    Abstract: The uncertain construction of hydropower projects and fierce market competition put forward more stringent requirements for contractors with regard to accuracy and competitiveness of cost estimation. However, previous probabilistic cost estimation models are mostly devoid of loss-sharing considerations. To fill this gap, this paper proposes a novel probabilistic cost estimation model integrating risk allocation and claim. The bargaining game between the owner and the contractor is first used to determine the proportion of risk allocation in the price fluctuation and the claim amount in the engineering quantity variation. Then, these two key parameters are incorporated into a Monte Carlo-based probabilistic cost risk simulation. The proposed model is applied to an actual hydropower project, and the results show that the risk reserve fund of the proposed model only accounts for 2.66% of the budget under 80% completion probability, and the average cost risk sensitive coefficient of the proposed model has more than tripled. From the results, the cost estimation value calculated by the novel model is more competitive and accurate in bidding; in addition, to reduce additional cost expenditures, the contractor should maintain a high level of patience during negotiations. This research contributes to improving the probability of winning a contract without sacrificing the contractor’s profit and to extending the current theory of probabilistic cost estimation.
    • Download: (1.680Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Novel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4268305
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYun Chen
    contributor authorShu Chen
    contributor authorChaoran Hu
    contributor authorLianghai Jin
    contributor authorXiazhong Zheng
    date accessioned2022-01-30T21:29:35Z
    date available2022-01-30T21:29:35Z
    date issued8/1/2020 12:00:00 AM
    identifier other%28ASCE%29CO.1943-7862.0001893.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268305
    description abstractThe uncertain construction of hydropower projects and fierce market competition put forward more stringent requirements for contractors with regard to accuracy and competitiveness of cost estimation. However, previous probabilistic cost estimation models are mostly devoid of loss-sharing considerations. To fill this gap, this paper proposes a novel probabilistic cost estimation model integrating risk allocation and claim. The bargaining game between the owner and the contractor is first used to determine the proportion of risk allocation in the price fluctuation and the claim amount in the engineering quantity variation. Then, these two key parameters are incorporated into a Monte Carlo-based probabilistic cost risk simulation. The proposed model is applied to an actual hydropower project, and the results show that the risk reserve fund of the proposed model only accounts for 2.66% of the budget under 80% completion probability, and the average cost risk sensitive coefficient of the proposed model has more than tripled. From the results, the cost estimation value calculated by the novel model is more competitive and accurate in bidding; in addition, to reduce additional cost expenditures, the contractor should maintain a high level of patience during negotiations. This research contributes to improving the probability of winning a contract without sacrificing the contractor’s profit and to extending the current theory of probabilistic cost estimation.
    publisherASCE
    titleNovel Probabilistic Cost Estimation Model Integrating Risk Allocation and Claim in Hydropower Project
    typeJournal Paper
    journal volume146
    journal issue8
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001893
    page11
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 008
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian