YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 19

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Analytical and Approximate Variance of Total Project Cost 

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 005
    Author(s): Martin Skitmore; S. Thomas Ng
    Publisher: American Society of Civil Engineers
    Abstract: The statistical variance of total project cost is usually estimated by means of Monte Carlo simulation on the assumption that exact analytic approaches are too difficult. This paper tests that assumption and shows that, ...
    Request PDF

    Optimizing Construction Time and Cost Using Ant Colony Optimization Approach 

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    Author(s): S. Thomas Ng; Yanshuai Zhang
    Publisher: American Society of Civil Engineers
    Abstract: Time and cost are the most important factors to be considered in every construction project. In order to maximize the return, both the client and contractor would strive to optimize the project duration and cost concurrently. ...
    Request PDF

    Multiobjective Bayesian Network Model for Public-Private Partnership Decision Support 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 009
    Author(s): Jingzhu Xie; S. Thomas Ng
    Publisher: American Society of Civil Engineers
    Abstract: To improve the chance of success of a public-private partnership (PPP) scheme, it is essential to consider the feasibility of the scheme both from the economical and noneconomical perspectives according to the interests ...
    Request PDF

    Virtual Project Delivery System Adviser 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2007:;Volume ( 133 ):;issue: 004
    Author(s): S. Thomas Ng; S. O. Cheung
    Publisher: American Society of Civil Engineers
    Abstract: The selection of an appropriate project delivery system (PDS) is of paramount importance to an infrastructure project, as it could affect the success of the plan in terms of time, cost, and quality. Researchers have advocated ...
    Request PDF

    Framework for Evaluating the Performance of Engineering Consultants 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2004:;Volume ( 130 ):;issue: 004
    Author(s): S. Thomas Ng; Lai-Kit Chow
    Publisher: American Society of Civil Engineers
    Abstract: The evaluation of consultant’s performance is crucial to the success of a consulting assignment especially when today’s construction projects are becoming more sophisticated, large-scale, and risky. However, since individual ...
    Request PDF

    Verification and Validation of Case-Based Prequalification System 

    Source: Journal of Computing in Civil Engineering:;1998:;Volume ( 012 ):;issue: 004
    Author(s): S. Thomas Ng; Nigel J. Smith
    Publisher: American Society of Civil Engineers
    Abstract: The current practice of contractor prequalification is characterized by the reliance on expert judgment and experiential knowledge. Previous studies have identified that the information concerning contractors' attributes ...
    Request PDF

    Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 002
    Author(s): Daisy X. M. Zheng; S. Thomas Ng
    Publisher: American Society of Civil Engineers
    Abstract: In a real construction project, the duration and cost of each activity could change dynamically as a result of many uncertain variables, such as weather, resource availability, productivity, etc. Managers/planners must ...
    Request PDF

    Improving Satisfaction through Conflict Stimulation and Resolution in Value Management in Construction Projects 

    Source: Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 002
    Author(s): Mei-yung Leung; S. Thomas Ng; Sai-On Cheung
    Publisher: American Society of Civil Engineers
    Abstract: Value management is a goal-setting process that aims to satisfy the client’s project requirements. However, goals cannot always be easily identified or agreed upon due to conflicts among project participants and/or objectives. ...
    Request PDF

    Evaluating Learning Approaches of Construction Students in Hong Kong through a Matrix Framework 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2004:;Volume ( 130 ):;issue: 003
    Author(s): Mei-yung Leung; S. Thomas Ng; Yin-kwan Li
    Publisher: American Society of Civil Engineers
    Abstract: Learning is a process of acquiring knowledge, and students may adopt different learning approaches to achieving their learning goals. While educationalists can draw up what they believe is a good construction curriculum ...
    Request PDF

    Modeling Multi-Stakeholder Multi-Objective Decisions during Public Participation in Major Infrastructure and Construction Projects: A Decision Rule Approach 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 003
    Author(s): Terry H. Y. Li; S. Thomas Ng; Martin Skitmore
    Publisher: American Society of Civil Engineers
    Abstract: Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision-making process of schemes of this ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian