YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Analytical and Approximate Variance of Total Project Cost

    Source: Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 005
    Author:
    Martin Skitmore
    ,
    S. Thomas Ng
    DOI: 10.1061/(ASCE)0733-9364(2002)128:5(456)
    Publisher: American Society of Civil Engineers
    Abstract: The statistical variance of total project cost is usually estimated by means of Monte Carlo simulation on the assumption that exact analytic approaches are too difficult. This paper tests that assumption and shows that, contrary to expectations, the analytic solution is relatively straightforward. It is also shown that the coefficient of variation is unaffected by the size (floor area) of the project when using standardized component costs. A case study is provided in which actual component costs are analyzed to obtain the required total cost variance. The results confirm previous work in showing that the approximation of the second moment (variance) under the assumption of independence considerably underestimates the exact value. The analysis then continues to examine the effects of professional judgment, and, with the simulated data used, the approximation is shown to be reasonably accurate—the professional judgment absorbing most of the intercorrelations involved. An example is also given in which the component unit quantities are priced by their average unit costs and which again shows the approximation to be close to the true value. Finally, this is extended to show how the exact total project cost variances may be obtained for each project.
    • Download: (53.28Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Analytical and Approximate Variance of Total Project Cost

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/20432
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorMartin Skitmore
    contributor authorS. Thomas Ng
    date accessioned2017-05-08T20:35:18Z
    date available2017-05-08T20:35:18Z
    date copyrightOctober 2002
    date issued2002
    identifier other%28asce%290733-9364%282002%29128%3A5%28456%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20432
    description abstractThe statistical variance of total project cost is usually estimated by means of Monte Carlo simulation on the assumption that exact analytic approaches are too difficult. This paper tests that assumption and shows that, contrary to expectations, the analytic solution is relatively straightforward. It is also shown that the coefficient of variation is unaffected by the size (floor area) of the project when using standardized component costs. A case study is provided in which actual component costs are analyzed to obtain the required total cost variance. The results confirm previous work in showing that the approximation of the second moment (variance) under the assumption of independence considerably underestimates the exact value. The analysis then continues to examine the effects of professional judgment, and, with the simulated data used, the approximation is shown to be reasonably accurate—the professional judgment absorbing most of the intercorrelations involved. An example is also given in which the component unit quantities are priced by their average unit costs and which again shows the approximation to be close to the true value. Finally, this is extended to show how the exact total project cost variances may be obtained for each project.
    publisherAmerican Society of Civil Engineers
    titleAnalytical and Approximate Variance of Total Project Cost
    typeJournal Paper
    journal volume128
    journal issue5
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2002)128:5(456)
    treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 005
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian