YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Optimizing Construction Time and Cost Using Ant Colony Optimization Approach

    Source: Journal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    Author:
    S. Thomas Ng
    ,
    Yanshuai Zhang
    DOI: 10.1061/(ASCE)0733-9364(2008)134:9(721)
    Publisher: American Society of Civil Engineers
    Abstract: Time and cost are the most important factors to be considered in every construction project. In order to maximize the return, both the client and contractor would strive to optimize the project duration and cost concurrently. Over the years, many research studies have been conducted to model the time–cost relationships, and the modeling techniques range from the heuristic methods and mathematical approaches to genetic algorithms. Despite that, previous studies often assumed the time being constant leaving the analyses based purely on a single objective—cost. Acknowledging the significance of time–cost optimization, an evolutionary-based optimization algorithm known as ant colony optimization is applied to solve the multiobjective time–cost optimization problems. In this paper, the basic mechanism of the proposed model is unveiled. Having developed a program in the Visual Basic platform, tests are conducted to compare the performance of the proposed model against other analytical methods previously used for time–cost modeling. The results show that the ant colony system approach is able to generate better solutions without utilizing much computational resources which provides a useful means to support planners and managers in making better time–cost decisions efficiently.
    • Download: (567.5Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Optimizing Construction Time and Cost Using Ant Colony Optimization Approach

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/28775
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorS. Thomas Ng
    contributor authorYanshuai Zhang
    date accessioned2017-05-08T20:50:17Z
    date available2017-05-08T20:50:17Z
    date copyrightSeptember 2008
    date issued2008
    identifier other%28asce%290733-9364%282008%29134%3A9%28721%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/28775
    description abstractTime and cost are the most important factors to be considered in every construction project. In order to maximize the return, both the client and contractor would strive to optimize the project duration and cost concurrently. Over the years, many research studies have been conducted to model the time–cost relationships, and the modeling techniques range from the heuristic methods and mathematical approaches to genetic algorithms. Despite that, previous studies often assumed the time being constant leaving the analyses based purely on a single objective—cost. Acknowledging the significance of time–cost optimization, an evolutionary-based optimization algorithm known as ant colony optimization is applied to solve the multiobjective time–cost optimization problems. In this paper, the basic mechanism of the proposed model is unveiled. Having developed a program in the Visual Basic platform, tests are conducted to compare the performance of the proposed model against other analytical methods previously used for time–cost modeling. The results show that the ant colony system approach is able to generate better solutions without utilizing much computational resources which provides a useful means to support planners and managers in making better time–cost decisions efficiently.
    publisherAmerican Society of Civil Engineers
    titleOptimizing Construction Time and Cost Using Ant Colony Optimization Approach
    typeJournal Paper
    journal volume134
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2008)134:9(721)
    treeJournal of Construction Engineering and Management:;2008:;Volume ( 134 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian