YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Optimal Sharing of Construction Project Outcomes with Downstream Contracting Parties: Principal–Agent Analysis 

    Source: Journal of Construction Engineering and Management:;2024:;Volume ( 150 ):;issue: 002:;page 04023156-1
    Author(s): S. Mahdi Hosseinian; Amirhomayoun Jaberi
    Publisher: ASCE
    Abstract: Sharing of a project’s outcomes drives the contracting parties to closer cooperation. However, subcontracting and sharing with downstream contracting parties (e.g., subcontractor and sub-subcontractor) have received ...
    Request PDF

    Optimal Outcome Sharing among Clients, Builders, and Designers in Collaborative Construction Contracts: Comparing Design–Bid–Build and Design–Build Methods Using Principal–Agent Theory 

    Source: Journal of Construction Engineering and Management:;2025:;Volume ( 151 ):;issue: 003:;page 04024212-1
    Author(s): Mitra Mokhtari; S. Mahdi Hosseinian
    Publisher: American Society of Civil Engineers
    Abstract: This study addresses a significant gap in the literature by proposing an optimal outcome–sharing framework within client–builder–designer relationships, specifically in design–bid–build (DBB) and design–build (DB) project ...
    Request PDF

    Novel Internal-Deterioration Model of Concrete Exposed to Freeze-Thaw Cycles 

    Source: Journal of Materials in Civil Engineering:;2017:;Volume ( 029 ):;issue: 009
    Author(s): Mahmoud Nili; Alireza Azarioon; S. Mahdi Hosseinian
    Publisher: American Society of Civil Engineers
    Request PDF

    Optimal Incentive Contract with Risk-Neutral Contractor 

    Source: Journal of Construction Engineering and Management:;2013:;Volume ( 139 ):;issue: 008
    Author(s): S. Mahdi Hosseinian; David G. Carmichael
    Publisher: American Society of Civil Engineers
    Abstract: Incentive clauses within contracts, referred to as incentive contracts in this paper, based on a sharing of the project outcome are regarded as an important vehicle to align contractor interests with that of the owner. ...
    Request PDF

    Intelligent Stochastic Agent-Based Model for Predicting Truck Production in Construction Sites by Considering Learning Effect 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 005:;page 04022018
    Author(s): S. Mahdi Hosseinian; Sanaz Younesi; Saleh Razini; David G. Carmichael
    Publisher: ASCE
    Abstract: Predicting truck production in construction projects is one of the basic tasks within project planning and control. This paper presents an original and novel intelligent stochastic agent-based model to maximize truck ...
    Request PDF

    Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters 

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001:;page 04021187
    Author(s): S. Mahdi Hosseinian; Mohammad Andalib; David G. Carmichael
    Publisher: ASCE
    Abstract: Choosing between different compensation strategies is one of the major concerns of owners in construction contracts. This paper is aimed at examining the choice between behavior-based and outcome-based payment types through ...
    Request PDF

    Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory 

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 004:;page 04022006
    Author(s): S. Mahdi Hosseinian; A. Arjomand; C. Q. Li; G. Zhang
    Publisher: ASCE
    Abstract: The reliability of a project completion time projection (PCT) is of significant concern to project managers, because it profoundly affects how a project is executed. Traditionally, such reliability has been treated as a ...
    Request PDF

    Optimum Outcome-Sharing Construction Contracts with Multiagent and Multioutcome Arrangements 

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 007
    Author(s): S. Mahdi Hosseinian; Elham Farahpour; David G. Carmichael
    Publisher: ASCE
    Abstract: Incentive contracts are widely used in construction to not only provide motivation but also to develop a cooperative relationship among project players. However, establishing the best outcome sharing is seen as a challenge ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian