Optimal Sharing of Construction Project Outcomes with Downstream Contracting Parties: Principal–Agent Analysis
Publisher: ASCE
Abstract: Sharing of a project’s outcomes drives the contracting parties to closer cooperation. However, subcontracting and sharing with downstream contracting parties (e.g., subcontractor and sub-subcontractor) have received ...
Optimal Outcome Sharing among Clients, Builders, and Designers in Collaborative Construction Contracts: Comparing Design–Bid–Build and Design–Build Methods Using Principal–Agent Theory
Publisher: American Society of Civil Engineers
Abstract: This study addresses a significant gap in the literature by proposing an optimal outcome–sharing framework within client–builder–designer relationships, specifically in design–bid–build (DBB) and design–build (DB) project ...
Novel Internal-Deterioration Model of Concrete Exposed to Freeze-Thaw Cycles
Publisher: American Society of Civil Engineers
Optimal Incentive Contract with Risk-Neutral Contractor
Publisher: American Society of Civil Engineers
Abstract: Incentive clauses within contracts, referred to as incentive contracts in this paper, based on a sharing of the project outcome are regarded as an important vehicle to align contractor interests with that of the owner. ...
Intelligent Stochastic Agent-Based Model for Predicting Truck Production in Construction Sites by Considering Learning Effect
Publisher: ASCE
Abstract: Predicting truck production in construction projects is one of the basic tasks within project planning and control. This paper presents an original and novel intelligent stochastic agent-based model to maximize truck ...
Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters
Publisher: ASCE
Abstract: Choosing between different compensation strategies is one of the major concerns of owners in construction contracts. This paper is aimed at examining the choice between behavior-based and outcome-based payment types through ...
Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory
Publisher: ASCE
Abstract: The reliability of a project completion time projection (PCT) is of significant concern to project managers, because it profoundly affects how a project is executed. Traditionally, such reliability has been treated as a ...
Optimum Outcome-Sharing Construction Contracts with Multiagent and Multioutcome Arrangements
Publisher: ASCE
Abstract: Incentive contracts are widely used in construction to not only provide motivation but also to develop a cooperative relationship among project players. However, establishing the best outcome sharing is seen as a challenge ...