YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001::page 04021187
    Author:
    S. Mahdi Hosseinian
    ,
    Mohammad Andalib
    ,
    David G. Carmichael
    DOI: 10.1061/(ASCE)CO.1943-7862.0002228
    Publisher: ASCE
    Abstract: Choosing between different compensation strategies is one of the major concerns of owners in construction contracts. This paper is aimed at examining the choice between behavior-based and outcome-based payment types through the views of practitioners from construction projects with variables defined by agency theory. The study adopts the analysis of data through the Delphi technique supported by factor analysis and multinomial logistic regressions to test the paper hypotheses. The paper shows that in projects with a high level of contractor risk aversion, outcome uncertainty, task programmability, and information systems, cost-plus-fee payment is more attractive than lump-sum payment. Conversely, the paper shows that in projects with a high level of goal conflict and outcome measurability, lump-sum payment is more attractive than cost-plus-fee payment. The results demonstrate the practical usefulness of agency theory in the arena of construction management. The contribution of this paper lies in providing insights into choosing an appropriate contract payment type based on agency theory parameters.
    • Download: (399.9Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283033
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorS. Mahdi Hosseinian
    contributor authorMohammad Andalib
    contributor authorDavid G. Carmichael
    date accessioned2022-05-07T20:53:04Z
    date available2022-05-07T20:53:04Z
    date issued2021-11-10
    identifier other(ASCE)CO.1943-7862.0002228.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283033
    description abstractChoosing between different compensation strategies is one of the major concerns of owners in construction contracts. This paper is aimed at examining the choice between behavior-based and outcome-based payment types through the views of practitioners from construction projects with variables defined by agency theory. The study adopts the analysis of data through the Delphi technique supported by factor analysis and multinomial logistic regressions to test the paper hypotheses. The paper shows that in projects with a high level of contractor risk aversion, outcome uncertainty, task programmability, and information systems, cost-plus-fee payment is more attractive than lump-sum payment. Conversely, the paper shows that in projects with a high level of goal conflict and outcome measurability, lump-sum payment is more attractive than cost-plus-fee payment. The results demonstrate the practical usefulness of agency theory in the arena of construction management. The contribution of this paper lies in providing insights into choosing an appropriate contract payment type based on agency theory parameters.
    publisherASCE
    titleAppropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters
    typeJournal Paper
    journal volume148
    journal issue1
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002228
    journal fristpage04021187
    journal lastpage04021187-14
    page14
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 148 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian