YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory

    Source: Journal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 004::page 04022006
    Author:
    S. Mahdi Hosseinian
    ,
    A. Arjomand
    ,
    C. Q. Li
    ,
    G. Zhang
    DOI: 10.1061/(ASCE)CO.1943-7862.0002252
    Publisher: ASCE
    Abstract: The reliability of a project completion time projection (PCT) is of significant concern to project managers, because it profoundly affects how a project is executed. Traditionally, such reliability has been treated as a time-independent variable, although the reliability of the PCT varies throughout the construction period. Little research has looked at the effect of time on the reliability of PCTs. This paper takes a new look at the probabilistic project scheduling problem by proposing a time-dependent reliability model for assessing the reliability of PCTs throughout construction. Ideas from time-dependent reliability theory and series system modeling are applied. A construction project is analyzed to illustrate the performance of the proposed method. It is found that that time-dependent reliability analysis is more appropriate for probabilistic project scheduling, and ignoring the time effect may lead to unrealistic estimates for probabilistic planning. It is also found that the proposed model is fast and accurate, compared to Monte Carlo analysis. The main contribution of this paper lies in incorporating the time-dependent variable in the project network scheduling problem.
    • Download: (1020.Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Developing a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4283057
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorS. Mahdi Hosseinian
    contributor authorA. Arjomand
    contributor authorC. Q. Li
    contributor authorG. Zhang
    date accessioned2022-05-07T20:54:15Z
    date available2022-05-07T20:54:15Z
    date issued2022-01-31
    identifier other(ASCE)CO.1943-7862.0002252.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4283057
    description abstractThe reliability of a project completion time projection (PCT) is of significant concern to project managers, because it profoundly affects how a project is executed. Traditionally, such reliability has been treated as a time-independent variable, although the reliability of the PCT varies throughout the construction period. Little research has looked at the effect of time on the reliability of PCTs. This paper takes a new look at the probabilistic project scheduling problem by proposing a time-dependent reliability model for assessing the reliability of PCTs throughout construction. Ideas from time-dependent reliability theory and series system modeling are applied. A construction project is analyzed to illustrate the performance of the proposed method. It is found that that time-dependent reliability analysis is more appropriate for probabilistic project scheduling, and ignoring the time effect may lead to unrealistic estimates for probabilistic planning. It is also found that the proposed model is fast and accurate, compared to Monte Carlo analysis. The main contribution of this paper lies in incorporating the time-dependent variable in the project network scheduling problem.
    publisherASCE
    titleDeveloping a Model for Assessing Project Completion Time Reliability during Construction Using Time-Dependent Reliability Theory
    typeJournal Paper
    journal volume148
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002252
    journal fristpage04022006
    journal lastpage04022006-14
    page14
    treeJournal of Construction Engineering and Management:;2022:;Volume ( 148 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian