YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-4 of 4

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Solving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
    Author(s): Duc-Hoc Tran; Min-Yuan Cheng; Minh-Tu Cao
    Publisher: American Society of Civil Engineers
    Abstract: Solving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential ...
    Request PDF

    Predicting Equilibrium Scour Depth at Bridge Piers Using Evolutionary Radial Basis Function Neural Network 

    Source: Journal of Computing in Civil Engineering:;2015:;Volume ( 029 ):;issue: 005
    Author(s): Min-Yuan Cheng; Minh-Tu Cao; Yu-Wei Wu
    Publisher: American Society of Civil Engineers
    Abstract: Scouring of bridge piers is a major cause of bridge failure worldwide. Thus, designing safe depths for new bridge foundations and assessing/monitoring the safety of existing bridge foundations are critical to reducing the ...
    Request PDF

    Solving Resource-Constrained Project Scheduling Problems Using Hybrid Artificial Bee Colony with Differential Evolution 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
    Author(s): Duc-Hoc Tran; Min-Yuan Cheng; Minh-Tu Cao
    Publisher: American Society of Civil Engineers
    Abstract: Solving resource-constrained (RC) project scheduling problems is one the most important tasks in the project planning process. This study presents a new hybrid approach, named Artificial Bee Colony with Differential ...
    Request PDF

    Hybrid Computational Model for Forecasting Taiwan Construction Cost Index 

    Source: Journal of Construction Engineering and Management:;2015:;Volume ( 141 ):;issue: 004
    Author(s): Minh-Tu Cao; Min-Yuan Cheng; Yu-Wei Wu
    Publisher: American Society of Civil Engineers
    Abstract: The ability to accurately forecast future trends in the Construction Cost Index (CCI) is critical for construction cost managers to prepare accurate budgets for owners and prepare proper bids for contractors. However, CCI ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian