Search
Now showing items 1-3 of 3
Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring
Publisher: ASCE
Abstract: In this study, earned duration management (EDM) is used as a statistical project control method to monitor the performance of engineering, procurement, and construction (EPC) projects. It represents an extension of the ...
Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring
Publisher: ASCE
Abstract: The design of control charts refers to the selection of the sample, the sampling interval, and the width of the control limits. The literature on the use of control charts for project monitoring is concerned mainly with ...
Asphalt Binder Linear Amplitude Sweep Test: Contribution Related to the α-Value Estimation
Publisher: ASCE
Abstract: This paper calls attention to important issues that have not been considered regarding linear amplitude sweep (LAS) test in previous publications: Is the relationship between the storage modulus logarithm [logG′(ω)] and ...
CSV
RIS