YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring

    Source: Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 009::page 04021108-1
    Author:
    Rodrigo Votto
    ,
    Linda Lee Ho
    ,
    Fernando Berssaneti
    DOI: 10.1061/(ASCE)CO.1943-7862.0002135
    Publisher: ASCE
    Abstract: The design of control charts refers to the selection of the sample, the sampling interval, and the width of the control limits. The literature on the use of control charts for project monitoring is concerned mainly with the first two parameters, and does not dedicate enough attention to how to determine the width of the control limits. This paper highlighted the relevant role that the appropriate definition of probabilistic control limit width plays in the project control and the performance of the control charts used to monitor the duration of construction projects. The main contribution is the proposal of a two-step simulation approach to set the most appropriate control limit width. The application of the proposed method was presented. Results demonstrated that there is a trade-off between the performance of the control charts and the control effort to investigate the cause of every warning signal. The preferable choice of α is influenced strongly by different project duration targets, risk and uncertainty scenarios estimated in the planning phase, and the team’s risk profile.
    • Download: (1.022Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Earned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4271979
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRodrigo Votto
    contributor authorLinda Lee Ho
    contributor authorFernando Berssaneti
    date accessioned2022-02-01T21:45:40Z
    date available2022-02-01T21:45:40Z
    date issued9/1/2021
    identifier other%28ASCE%29CO.1943-7862.0002135.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271979
    description abstractThe design of control charts refers to the selection of the sample, the sampling interval, and the width of the control limits. The literature on the use of control charts for project monitoring is concerned mainly with the first two parameters, and does not dedicate enough attention to how to determine the width of the control limits. This paper highlighted the relevant role that the appropriate definition of probabilistic control limit width plays in the project control and the performance of the control charts used to monitor the duration of construction projects. The main contribution is the proposal of a two-step simulation approach to set the most appropriate control limit width. The application of the proposed method was presented. Results demonstrated that there is a trade-off between the performance of the control charts and the control effort to investigate the cause of every warning signal. The preferable choice of α is influenced strongly by different project duration targets, risk and uncertainty scenarios estimated in the planning phase, and the team’s risk profile.
    publisherASCE
    titleEarned Duration Management Control Charts: Role of Control Limit Width Definition for Construction Project Duration Monitoring
    typeJournal Paper
    journal volume147
    journal issue9
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0002135
    journal fristpage04021108-1
    journal lastpage04021108-14
    page14
    treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 009
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian