YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring

    Source: Journal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 003
    Author:
    Rodrigo Votto
    ,
    Linda Lee Ho
    ,
    Fernando Berssaneti
    DOI: 10.1061/(ASCE)CO.1943-7862.0001765
    Publisher: ASCE
    Abstract: In this study, earned duration management (EDM) is used as a statistical project control method to monitor the performance of engineering, procurement, and construction (EPC) projects. It represents an extension of the well-known earned value management (EVM) and earned schedule management (ESM) methodologies. In contrast to the latter techniques, which use cost-based data as proxies for assessing the project duration performance, EDM uses time-based metrics for its evaluation. In this method, control charts are employed to monitor deviations during project execution and to identify special sources of variation, interpreted as evidence of real risk of project delays. Monte Carlo simulations are conducted to determine the control limits. The major contribution of this study lies both in the use of control charts with control limits obtained by simulations to monitor the new duration performance index (DPI) in a real EPC project, and in the assessment of its performance compared with that of the traditional EVM and ESM indexes. The results of computational experiments demonstrated generally good performance characteristics of the proposed control charts and suggest that the DPI potentially can be used as a promising metric for monitoring the project duration performance.
    • Download: (1.595Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Applying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/4265138
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorRodrigo Votto
    contributor authorLinda Lee Ho
    contributor authorFernando Berssaneti
    date accessioned2022-01-30T19:21:25Z
    date available2022-01-30T19:21:25Z
    date issued2020
    identifier other%28ASCE%29CO.1943-7862.0001765.pdf
    identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265138
    description abstractIn this study, earned duration management (EDM) is used as a statistical project control method to monitor the performance of engineering, procurement, and construction (EPC) projects. It represents an extension of the well-known earned value management (EVM) and earned schedule management (ESM) methodologies. In contrast to the latter techniques, which use cost-based data as proxies for assessing the project duration performance, EDM uses time-based metrics for its evaluation. In this method, control charts are employed to monitor deviations during project execution and to identify special sources of variation, interpreted as evidence of real risk of project delays. Monte Carlo simulations are conducted to determine the control limits. The major contribution of this study lies both in the use of control charts with control limits obtained by simulations to monitor the new duration performance index (DPI) in a real EPC project, and in the assessment of its performance compared with that of the traditional EVM and ESM indexes. The results of computational experiments demonstrated generally good performance characteristics of the proposed control charts and suggest that the DPI potentially can be used as a promising metric for monitoring the project duration performance.
    publisherASCE
    titleApplying and Assessing Performance of Earned Duration Management Control Charts for EPC Project Duration Monitoring
    typeJournal Paper
    journal volume146
    journal issue3
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)CO.1943-7862.0001765
    page04020001
    treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian