YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    IRIER: A Decision-Support Model for Optimal Energy Retrofit Investments 

    Source: Journal of Construction Engineering and Management:;2017:;Volume ( 143 ):;issue: 009
    Author(s): Seyedmohammadhossein Hosseinian; Kunhee Choi; Junseo Bae
    Publisher: American Society of Civil Engineers
    Abstract: The importance of energy efficiency investment has grown substantially in recent decades, although research into the decision-making processes under energy saving uncertainties has been fairly limited. The main objective ...
    Request PDF

    OPTID: Optimal Incentives and Disincentives 

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 005:;page 04021054-1
    Author(s): Kunhee Choi; Junseo Bae; Young Hoon Kwak
    Publisher: ASCE
    Abstract: Contracting agencies must be able to offer incentive/disincentive (I/D) rates greater than the builder’s added cost (BAC) of acceleration. Doing so encourages qualified contractors to bid on projects. Most agencies determine ...
    Request PDF

    Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis 

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
    Author(s): Kunhee Choi; Yoo Hyun Kim; Junseo Bae; Hyun Woo Lee
    Publisher: American Society of Civil Engineers
    Abstract: Life-cycle cost analysis (LCCA) has grown in importance, yet it is also regarded as a daunting task, because of the lack of reliable analytical models specifically aimed at quantifying future maintenance costs (FMC). The ...
    Request PDF

    Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions 

    Source: Journal of Construction Engineering and Management:;2016:;Volume ( 142 ):;issue: 003
    Author(s): Kunhee Choi; Hyun Woo Lee; Junseo Bae; David Bilbo
    Publisher: American Society of Civil Engineers
    Abstract: Accelerated contract provisions (ACPs) such as cost-plus-time (
    Request PDF

    ACT<sup>2</sup>: Time&#x2013;Cost Tradeoffs from Alternative Contracting Methods 

    Source: Journal of Management in Engineering:;2021:;Volume ( 037 ):;issue: 001:;page 04020091
    Author(s): Kunhee Choi; Junseo Bae; Yangtian Yin; Hyun Woo Lee
    Publisher: ASCE
    Abstract: Incentive/disincentive (I/D) and cost-plus-time (A+B) are two of the most widely used alternative contracting methods (ACMs) for accelerating the construction of highway infrastructure improvement projects. However, little ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian