YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Computing in Civil Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis

    Source: Journal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
    Author:
    Kunhee Choi
    ,
    Yoo Hyun Kim
    ,
    Junseo Bae
    ,
    Hyun Woo Lee
    DOI: 10.1061/(ASCE)CP.1943-5487.0000533
    Publisher: American Society of Civil Engineers
    Abstract: Life-cycle cost analysis (LCCA) has grown in importance, yet it is also regarded as a daunting task, because of the lack of reliable analytical models specifically aimed at quantifying future maintenance costs (FMC). The key objectives of this study are to identify the most critical factors that affect pavement performance, create a FMC predictive model that accounts for such factors, and validate the model’s robustness in quantifying a reliable FMC for low-volume highway rehabilitation projects. This study combines regression analysis techniques with a cluster analysis by using a large quantity of real-world data obtained from the pavement management information system. The clustering analysis revealed that traffic loading would be the most crucial affecting factor for pavement performance. A series of sensitivity analyses were performed to investigate the effect of individual critical performance-driven factors on FMC. A prediction error analysis validated the model’s robustness, proving that reliable FMC can be estimated by analyzing how it interacts with the affecting factors. This study assists industry practitioners and researchers in quickly and reliably determining long-term FMC for incorporation into LCCA. Knowing a conceptual estimate of FMC in the very early project scoping stage could also help them develop a sounder strategic plan within project constraints and peculiarities from the LCCA standpoint.
    • Download: (8.601Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Determining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/81985
    Collections
    • Journal of Computing in Civil Engineering

    Show full item record

    contributor authorKunhee Choi
    contributor authorYoo Hyun Kim
    contributor authorJunseo Bae
    contributor authorHyun Woo Lee
    date accessioned2017-05-08T22:31:24Z
    date available2017-05-08T22:31:24Z
    date copyrightJuly 2016
    date issued2016
    identifier other48323548.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/81985
    description abstractLife-cycle cost analysis (LCCA) has grown in importance, yet it is also regarded as a daunting task, because of the lack of reliable analytical models specifically aimed at quantifying future maintenance costs (FMC). The key objectives of this study are to identify the most critical factors that affect pavement performance, create a FMC predictive model that accounts for such factors, and validate the model’s robustness in quantifying a reliable FMC for low-volume highway rehabilitation projects. This study combines regression analysis techniques with a cluster analysis by using a large quantity of real-world data obtained from the pavement management information system. The clustering analysis revealed that traffic loading would be the most crucial affecting factor for pavement performance. A series of sensitivity analyses were performed to investigate the effect of individual critical performance-driven factors on FMC. A prediction error analysis validated the model’s robustness, proving that reliable FMC can be estimated by analyzing how it interacts with the affecting factors. This study assists industry practitioners and researchers in quickly and reliably determining long-term FMC for incorporation into LCCA. Knowing a conceptual estimate of FMC in the very early project scoping stage could also help them develop a sounder strategic plan within project constraints and peculiarities from the LCCA standpoint.
    publisherAmerican Society of Civil Engineers
    titleDetermining Future Maintenance Costs of Low-Volume Highway Rehabilitation Projects for Incorporation into Life-Cycle Cost Analysis
    typeJournal Paper
    journal volume30
    journal issue4
    journal titleJournal of Computing in Civil Engineering
    identifier doi10.1061/(ASCE)CP.1943-5487.0000533
    treeJournal of Computing in Civil Engineering:;2016:;Volume ( 030 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian