YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-8 of 8

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Routing Large Vehicles on Industrial Construction Sites 

    Source: Journal of Construction Engineering and Management:;1995:;Volume ( 121 ):;issue: 001
    Author(s): K. Varghese; J. T. O'Connor
    Publisher: American Society of Civil Engineers
    Abstract: This paper describes the development of a prototype system for planning access routes for large vehicles within an industrial construction site. Access planning is an important consideration in the development of an effective ...
    Request PDF

    Redesign of Vendor-Data Processes for Industrial Projects 

    Source: Journal of Management in Engineering:;1996:;Volume ( 012 ):;issue: 005
    Author(s): H. Y. Goucha; J. T. O'Connor
    Publisher: American Society of Civil Engineers
    Abstract: The vendor-data processes within industrial piping design are very inefficient throughout the industry. Through personal interviews with procurement experts, the problems causing these inefficiencies were identified. The ...
    Request PDF

    ArcSite: Enhanced GIS for Construction Site Layout 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 004
    Author(s): M. Y. Cheng; J. T. O'Connor
    Publisher: American Society of Civil Engineers
    Abstract: This study develops an automated site layout system for construction temporary facilities (TFs). The system, ArcSite, including a geographic information system (GIS) integrated with database management systems (DBMSs) is ...
    Request PDF

    Procurement of Design-Build Services: Two-Phase Selection for Highway Projects 

    Source: Journal of Management in Engineering:;2009:;Volume ( 025 ):;issue: 001
    Author(s): G. C. Migliaccio; G. E. Gibson; J. T. O’Connor
    Publisher: American Society of Civil Engineers
    Abstract: In the United States, public agencies are adopting the design-build (DB) delivery method for delivering highway projects after having used the traditional design-bid-build method for generations. In the 2002 design-build ...
    Request PDF

    Pipe Manipulator Enhancements for Increased Automation 

    Source: Journal of Construction Engineering and Management:;1989:;Volume ( 115 ):;issue: 003
    Author(s): P. J. Hughes; J. T. O'Connor; A. E. Traver
    Publisher: American Society of Civil Engineers
    Abstract: Piping commonly makes up 20–30% of the installed cost of a process plant. The prospects for making piping erection a repetitive, efficient process create a new demand for powerful, specialized pipe erection equipment. A ...
    Request PDF

    Improving Highway Specifications for Constructibility 

    Source: Journal of Construction Engineering and Management:;1991:;Volume ( 117 ):;issue: 002
    Author(s): J. T. O'Connor; F. Hugo; E. M. Stamm
    Publisher: American Society of Civil Engineers
    Abstract: Project constructibility, the measure of ease with which a facility can be constructed, is keenly affected by the quality of technical specifications. Poor specifications can cause delays, rework, and claims, as well as ...
    Request PDF

    Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities 

    Source: Journal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 003
    Author(s): Khali R. Persad; J. T. O'Connor; Koshy Varghese
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents statistical models for forecasting the engineering manpower requirements for highway preconstruction activities. Two sets of models were developed in this study. In the first set of models, the independent ...
    Request PDF

    Computer‐Aided Planning for Heavy Lifts 

    Source: Journal of Construction Engineering and Management:;1993:;Volume ( 119 ):;issue: 003
    Author(s): W. C. Hornaday; C. T. Haas; J. T. O'Connor; J. Wen
    Publisher: American Society of Civil Engineers
    Abstract: This article presents research into automating some lift planning practices common to industrial construction contractors and owners. A detailed investigation of heavy‐lift planning methods was conducted through a series ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian