YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Procurement of Design-Build Services: Two-Phase Selection for Highway Projects

    Source: Journal of Management in Engineering:;2009:;Volume ( 025 ):;issue: 001
    Author:
    G. C. Migliaccio
    ,
    G. E. Gibson
    ,
    J. T. O’Connor
    DOI: 10.1061/(ASCE)0742-597X(2009)25:1(29)
    Publisher: American Society of Civil Engineers
    Abstract: In the United States, public agencies are adopting the design-build (DB) delivery method for delivering highway projects after having used the traditional design-bid-build method for generations. In the 2002 design-build contracting final rule, the Federal Highway Administration (FHWA) strongly encourages the use of two-phase selection procedures for DB procurement. This paper takes a case study approach to investigating the use of a two-phase process for selecting providers of highway design-build services. Using two DB projects in central Texas as case studies, the writers have analyzed project documentation and performed interviews with 37 project participants involved in procurement, including owner representatives and legal consultants. For the first case, the writers selected the $1.3 billion SH-130 tolled expressway project in central Texas. Procurement of the SH-130 DB contract was performed before the FHWA rule on DB contracting was released. In addition, the writers examined procurement activities for the $154 million DB contract for the SH-45 SE tolled expressway, which was procured by the same owner in 2004 following procedures identified in the FHWA rule. As a result, a process was developed that included activities to be performed between the delivery method decision and the contract execution. This process model tracks the differences between the SH-130 and the SH-45 SE processes that are attributable to the latter’s adoption of the FHWA Rule.
    • Download: (437.3Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Procurement of Design-Build Services: Two-Phase Selection for Highway Projects

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/42529
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorG. C. Migliaccio
    contributor authorG. E. Gibson
    contributor authorJ. T. O’Connor
    date accessioned2017-05-08T21:12:04Z
    date available2017-05-08T21:12:04Z
    date copyrightJanuary 2009
    date issued2009
    identifier other%28asce%290742-597x%282009%2925%3A1%2829%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42529
    description abstractIn the United States, public agencies are adopting the design-build (DB) delivery method for delivering highway projects after having used the traditional design-bid-build method for generations. In the 2002 design-build contracting final rule, the Federal Highway Administration (FHWA) strongly encourages the use of two-phase selection procedures for DB procurement. This paper takes a case study approach to investigating the use of a two-phase process for selecting providers of highway design-build services. Using two DB projects in central Texas as case studies, the writers have analyzed project documentation and performed interviews with 37 project participants involved in procurement, including owner representatives and legal consultants. For the first case, the writers selected the $1.3 billion SH-130 tolled expressway project in central Texas. Procurement of the SH-130 DB contract was performed before the FHWA rule on DB contracting was released. In addition, the writers examined procurement activities for the $154 million DB contract for the SH-45 SE tolled expressway, which was procured by the same owner in 2004 following procedures identified in the FHWA rule. As a result, a process was developed that included activities to be performed between the delivery method decision and the contract execution. This process model tracks the differences between the SH-130 and the SH-45 SE processes that are attributable to the latter’s adoption of the FHWA Rule.
    publisherAmerican Society of Civil Engineers
    titleProcurement of Design-Build Services: Two-Phase Selection for Highway Projects
    typeJournal Paper
    journal volume25
    journal issue1
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(2009)25:1(29)
    treeJournal of Management in Engineering:;2009:;Volume ( 025 ):;issue: 001
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian