YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Management in Engineering
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities

    Source: Journal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 003
    Author:
    Khali R. Persad
    ,
    J. T. O'Connor
    ,
    Koshy Varghese
    DOI: 10.1061/(ASCE)0742-597X(1995)11:3(41)
    Publisher: American Society of Civil Engineers
    Abstract: This paper presents statistical models for forecasting the engineering manpower requirements for highway preconstruction activities. Two sets of models were developed in this study. In the first set of models, the independent variable used was estimated construction cost, and in the second set of models the estimated construction cost and project type were the independent variables. The models forecast engineering manpower requirements in terms of engineering man-hours as well as engineering cost. The data used to derive the models were collected from projects awarded for construction by the Texas Department of Transportation (TxDOT). Simple linear-regression and multiple-regression techniques were used to derive the models. Curves developed from the models illustrating design man-hours per million dollars of construction as well as engineering as a percentage of construction cost are also presented. This study found that project construction cost and project type are excellent predictors of engineering manpower requirements.
    • Download: (818.8Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Forecastng Engineering Manpower Requirements for Highway Preconstruction Activities

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/41828
    Collections
    • Journal of Management in Engineering

    Show full item record

    contributor authorKhali R. Persad
    contributor authorJ. T. O'Connor
    contributor authorKoshy Varghese
    date accessioned2017-05-08T21:10:58Z
    date available2017-05-08T21:10:58Z
    date copyrightMay 1995
    date issued1995
    identifier other%28asce%290742-597x%281995%2911%3A3%2841%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/41828
    description abstractThis paper presents statistical models for forecasting the engineering manpower requirements for highway preconstruction activities. Two sets of models were developed in this study. In the first set of models, the independent variable used was estimated construction cost, and in the second set of models the estimated construction cost and project type were the independent variables. The models forecast engineering manpower requirements in terms of engineering man-hours as well as engineering cost. The data used to derive the models were collected from projects awarded for construction by the Texas Department of Transportation (TxDOT). Simple linear-regression and multiple-regression techniques were used to derive the models. Curves developed from the models illustrating design man-hours per million dollars of construction as well as engineering as a percentage of construction cost are also presented. This study found that project construction cost and project type are excellent predictors of engineering manpower requirements.
    publisherAmerican Society of Civil Engineers
    titleForecastng Engineering Manpower Requirements for Highway Preconstruction Activities
    typeJournal Paper
    journal volume11
    journal issue3
    journal titleJournal of Management in Engineering
    identifier doi10.1061/(ASCE)0742-597X(1995)11:3(41)
    treeJournal of Management in Engineering:;1995:;Volume ( 011 ):;issue: 003
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian