Framework for PMS Using Mechanistic Distress Submodels
Publisher: American Society of Civil Engineers
Abstract: A framework for a pavement-management system is presented, which employs mechanistic performance submodels to predict pavement behavior. These performance submodels predict the development of pavement distresses in terms ...
Preemptive Constraint Analysis in Construction Schedules
Publisher: American Society of Civil Engineers
Abstract: This paper is set in the context of constraint-based construction alternative scheduling with complex temporal constraints. In construction schedules, the relationships among constraints directly impact the scheduling ...
IFC-Based Framework to Move beyond Individual Building Elements toward Configuring a Higher Level of Prefabrication
Publisher: American Society of Civil Engineers
Abstract: Prefabrication is a form of industrialization that transfers some stages of the construction project from fields to an off-site production facility. The most widely used form of prefabrication in construction is the use ...
Temporal Logic Representation Schema for Intermediate Function
Publisher: American Society of Civil Engineers
Abstract: There are temporal relationships other than the precedence ones between construction activities. Many of these relationships are related to the perspective of intermediate function requirement. The construction industry ...
Modeling of Functional Construction Requirements for Constructability Analysis
Publisher: American Society of Civil Engineers
Abstract: Evaluating construction requirements should be an indispensable part of improving the constructability of a facility project. However, a number of existing function analysis approaches focus mainly on the final functions ...
PDM++: Planning Framework from a Construction Requirements Perspective
Publisher: American Society of Civil Engineers
Abstract: Construction requirements represent the key preconditions for construction. These include topological precedence, key resources, space requirements, etc. Consequently, identifying them is necessary for feasible construction ...
Requirement and Availability Time-Window Analysis of Intermediate Function
Publisher: American Society of Civil Engineers
Abstract: Many existing resource-constrained scheduling tools may be inadequate for representing and evaluating intermediate functions, a major category of construction requirements, with respect to availability time-windows and ...
Optimizing Crane Selection and Location for Multistage Construction Using a Four-Dimensional Set Cover Approach
Publisher: American Society of Civil Engineers
Abstract: Crane selection and location planning exists as part of a series of critical decisions faced by construction managers. As today’s construction projects grow increasingly complex and complicated construction schemes involving ...
Quantification of Spatial Temporal Congestion in Four-Dimensional Computer-Aided Design
Publisher: American Society of Civil Engineers
Abstract: This paper further develops the models proposed by prior research in the field of workspace conflict using four-dimensional computer-aided design. The approach developed here analyzes spatial demand and supply from the ...
Deep Learning–Based Enhancement of Motion Blurred UAV Concrete Crack Images
Publisher: ASCE
Abstract: Building façade inspection and maintenance needs to be carried out periodically, and the detection of cracks is a core component of the inspection process. The current inspection procedure is labor-intensive and time-consuming ...