YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Temporal Logic Representation Schema for Intermediate Function

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 004
    Author:
    Yuanbin Song
    ,
    David K. H. Chua
    DOI: 10.1061/(ASCE)0733-9364(2007)133:4(277)
    Publisher: American Society of Civil Engineers
    Abstract: There are temporal relationships other than the precedence ones between construction activities. Many of these relationships are related to the perspective of intermediate function requirement. The construction industry still lacks a representation schema for capturing the temporal logics residing in this kind of construction requirement. This study presents a schema for representing these temporal logics from three perspectives, namely the construction life cycle of a single product component, the functional interdependencies between two in-progress components, and the availability conditions of an intermediate functionality. In this way, the concurrency relationships among the construction processes can be identified and evaluated, and the intermediate function analysis can be conducted more efficiently, thus contributing to improvement of the executability of construction schedules. Additionally, the temporal logics have been formulated in the format based on temporal interval algebra, which provides a richer semantic representation compared to the traditional precedence relationship types. Finally, using a four-dimensional simulation prototype, a case study of constructing the deck of a bridge by the balanced cantilever approach is modeled to demonstrate the representation of the three perspectives of intermediate function requirements.
    • Download: (1.337Mb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Temporal Logic Representation Schema for Intermediate Function

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/27053
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorYuanbin Song
    contributor authorDavid K. H. Chua
    date accessioned2017-05-08T20:47:03Z
    date available2017-05-08T20:47:03Z
    date copyrightApril 2007
    date issued2007
    identifier other%28asce%290733-9364%282007%29133%3A4%28277%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/27053
    description abstractThere are temporal relationships other than the precedence ones between construction activities. Many of these relationships are related to the perspective of intermediate function requirement. The construction industry still lacks a representation schema for capturing the temporal logics residing in this kind of construction requirement. This study presents a schema for representing these temporal logics from three perspectives, namely the construction life cycle of a single product component, the functional interdependencies between two in-progress components, and the availability conditions of an intermediate functionality. In this way, the concurrency relationships among the construction processes can be identified and evaluated, and the intermediate function analysis can be conducted more efficiently, thus contributing to improvement of the executability of construction schedules. Additionally, the temporal logics have been formulated in the format based on temporal interval algebra, which provides a richer semantic representation compared to the traditional precedence relationship types. Finally, using a four-dimensional simulation prototype, a case study of constructing the deck of a bridge by the balanced cantilever approach is modeled to demonstrate the representation of the three perspectives of intermediate function requirements.
    publisherAmerican Society of Civil Engineers
    titleTemporal Logic Representation Schema for Intermediate Function
    typeJournal Paper
    journal volume133
    journal issue4
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(2007)133:4(277)
    treeJournal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 004
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian