YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-10 of 14

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Classifying Construction Contractors Using Unsupervised-Learning Neural Networks 

    Source: Journal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 012
    Author(s): Ashraf M. Elazouni
    Publisher: American Society of Civil Engineers
    Abstract: Contractor prequalification involves the screening of contractors by a project owner to determine their competence to complete the project on time, within budget, and to expected quality standards. The process of ...
    Request PDF

    Constructability Improvement of Steel Silos during Field Operations 

    Source: Journal of Construction Engineering and Management:;1997:;Volume ( 123 ):;issue: 001
    Author(s): Ashraf M. Elazouni
    Publisher: American Society of Civil Engineers
    Abstract: Steel silos are widespread around the world, and are used for storing different materials, including cement, fertilizers, grains, and raw materials. Building a new silo provides a fairly big storage capacity within a short ...
    Request PDF

    Simulation Model for Determining Maintenance Staffing in Higher Education Facilities 

    Source: Journal of Performance of Constructed Facilities:;2008:;Volume ( 022 ):;issue: 001
    Author(s): Ashraf M. Elazouni; Arifusalam Shaikh
    Publisher: American Society of Civil Engineers
    Abstract: Expeditious repair of the unpredicted breakdown of the systems components of facilities is a crucial demand that is highly conducive to the convenience of users and to the longevity of systems. The determination of maintenance ...
    Request PDF

    Footbridge: Project to Implement Management Functions at AASTMT 

    Source: Journal of Professional Issues in Engineering Education and Practice:;2003:;Volume ( 129 ):;issue: 001
    Author(s): Ashraf M. Elazouni; Mohamed S. Raslan
    Publisher: American Society of Civil Engineers
    Abstract: Recently, the construction industry has introduced fundamental changes for integration of functions during the different project phases. The design/build approach that integrates design and construction is a prominent ...
    Request PDF

    Precedence-Preserving GAs Operators for Scheduling Problems with Activities’ Start Times Encoding 

    Source: Journal of Computing in Civil Engineering:;2010:;Volume ( 024 ):;issue: 004
    Author(s): M. A. Abido; Ashraf M. Elazouni
    Publisher: American Society of Civil Engineers
    Abstract: Precedence-preserving crossover and mutation operators for scheduling problems with activities’ start times encoding are proposed and employed in this paper. The objective is to tackle the incapability of the genetic ...
    Request PDF

    Multiobjective Evolutionary Finance-Based Scheduling: Entire Projects’ Portfolio 

    Source: Journal of Computing in Civil Engineering:;2011:;Volume ( 025 ):;issue: 001
    Author(s): M. A. Abido; Ashraf M. Elazouni
    Publisher: American Society of Civil Engineers
    Abstract: A strength Pareto evolutionary algorithm (SPEA) is proposed and was modified by incorporating logic-preserving crossover and mutation operators and employed to devise a set of optimum finance-based schedules of multiple ...
    Request PDF

    Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules 

    Source: Journal of Construction Engineering and Management:;2007:;Volume ( 133 ):;issue: 001
    Author(s): Ashraf M. Elazouni; Fikry G. Metwally
    Publisher: American Society of Civil Engineers
    Abstract: Construction contractors often finance projects using bank credit lines that allow contractors to withdraw money up to certain credit limits. Finance-based scheduling provides schedules that ensure that the contractor’s ...
    Request PDF

    Finance-Based Scheduling: Tool to Maximize Project Profit Using Improved Genetic Algorithms 

    Source: Journal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 004
    Author(s): Ashraf M. Elazouni; Fikry Gomaa Metwally
    Publisher: American Society of Civil Engineers
    Abstract: Contractor’s ability to procure cash to carry out construction operations represents a crucial factor to run profitable business. Bank overdrafts have always been the major source to finance construction projects. However, ...
    Request PDF

    Evaluating the Performance of Construction Equipment Operators in Egypt 

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 002
    Author(s): Ashraf M. Elazouni; Ismail M. Basha
    Publisher: American Society of Civil Engineers
    Abstract: Problems in operating construction equipment in Egypt were perceived as resulting in low productivity. Productivity was considered in this study as a measurement dimension that sufficiently describes operator's performance. ...
    Request PDF

    Finance-Based Scheduling of Construction Projects Using Integer Programming 

    Source: Journal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 001
    Author(s): Ashraf M. Elazouni; Ahmed A. Gab-Allah
    Publisher: American Society of Civil Engineers
    Abstract: Construction scheduling is the process of devising schemes for sequencing activities. A realistic schedule fulfills the real concerns of users, thus minimizing the chances of schedule failure. The minimization of total ...
    Request PDF
    • 1
    • 2
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    ... View More

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian