YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    View Item 
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    •   YE&T Library
    • ASCE
    • Journal of Construction Engineering and Management
    • View Item
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Archive

    Evaluating the Performance of Construction Equipment Operators in Egypt

    Source: Journal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 002
    Author:
    Ashraf M. Elazouni
    ,
    Ismail M. Basha
    DOI: 10.1061/(ASCE)0733-9364(1996)122:2(109)
    Publisher: American Society of Civil Engineers
    Abstract: Problems in operating construction equipment in Egypt were perceived as resulting in low productivity. Productivity was considered in this study as a measurement dimension that sufficiently describes operator's performance. The objectives of this study are to provide an analytical approach for identifying causes of productivity loss and evaluating their effects, and to evaluate the performance of equipment operators. The performance ability ratio (PAR) compares the actual productivity against the estimated productivity to demonstrate the amount of loss of productivity and, thus, judge the level of operator productivity. The study was conducted at 11 jobs concerning 11 pieces of earthmoving equipment: three bulldozers, three elevating scrapers, three off-highway trucks, and two hydraulic backhoe excavators. The analysis led to basic conclusions concerning the amount of downtime and its variation according to equipment type, and the average PAR values for operators of the four types of equipment.
    • Download: (728.4Kb)
    • Show Full MetaData Hide Full MetaData
    • Get RIS
    • Item Order
    • Go To Publisher
    • Price: 5000 Rial
    • Statistics

      Evaluating the Performance of Construction Equipment Operators in Egypt

    URI
    http://yetl.yabesh.ir/yetl1/handle/yetl/83657
    Collections
    • Journal of Construction Engineering and Management

    Show full item record

    contributor authorAshraf M. Elazouni
    contributor authorIsmail M. Basha
    date accessioned2017-05-08T22:36:33Z
    date available2017-05-08T22:36:33Z
    date copyrightJune 1996
    date issued1996
    identifier other%28asce%290733-9364%281996%29122%3A2%28109%29.pdf
    identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/83657
    description abstractProblems in operating construction equipment in Egypt were perceived as resulting in low productivity. Productivity was considered in this study as a measurement dimension that sufficiently describes operator's performance. The objectives of this study are to provide an analytical approach for identifying causes of productivity loss and evaluating their effects, and to evaluate the performance of equipment operators. The performance ability ratio (PAR) compares the actual productivity against the estimated productivity to demonstrate the amount of loss of productivity and, thus, judge the level of operator productivity. The study was conducted at 11 jobs concerning 11 pieces of earthmoving equipment: three bulldozers, three elevating scrapers, three off-highway trucks, and two hydraulic backhoe excavators. The analysis led to basic conclusions concerning the amount of downtime and its variation according to equipment type, and the average PAR values for operators of the four types of equipment.
    publisherAmerican Society of Civil Engineers
    titleEvaluating the Performance of Construction Equipment Operators in Egypt
    typeJournal Paper
    journal volume122
    journal issue2
    journal titleJournal of Construction Engineering and Management
    identifier doi10.1061/(ASCE)0733-9364(1996)122:2(109)
    treeJournal of Construction Engineering and Management:;1996:;Volume ( 122 ):;issue: 002
    contenttypeFulltext
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian