YaBeSH Engineering and Technology Library

    • Journals
    • PaperQuest
    • YSE Standards
    • YaBeSH
    • Login
    Search 
    •   YE&T Library
    • Search
    •   YE&T Library
    • Search
    • All Fields
    • Source Title
    • Year
    • Publisher
    • Title
    • Subject
    • Author
    • DOI
    • ISBN
    Advanced Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-5 of 5

    • Relevance
    • Title Asc
    • Title Desc
    • Year Asc
    • Year Desc
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
  • Export
    • CSV
    • RIS
    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100

    Defining Cost/Schedule Performance Indices and Their Ranges for Design Projects 

    Source: Journal of Management in Engineering:;2001:;Volume ( 017 ):;issue: 002
    Author(s): Andrew Shing-Tao Chang
    Publisher: American Society of Civil Engineers
    Abstract: Cost/schedule performance indices (C/SPIs) can indicate project performance, but they need to be operationally defined to be more adopted in practice. This paper defines C/SPIs and their values for design projects. From ...
    Request PDF

    Reasons for Cost and Schedule Increase for Engineering Design Projects 

    Source: Journal of Management in Engineering:;2002:;Volume ( 018 ):;issue: 001
    Author(s): Andrew Shing-Tao Chang
    Publisher: American Society of Civil Engineers
    Abstract: Cost and schedule increases are common in engineering design projects. Some research has studied factors associated with better design performance, but the reasons for cost and schedule increases are not formally investigated. ...
    Request PDF

    Work-Time Model for Engineers 

    Source: Journal of Construction Engineering and Management:;2001:;Volume ( 127 ):;issue: 002
    Author(s): Andrew Shing-Tao Chang
    Publisher: American Society of Civil Engineers
    Abstract: The purpose of this paper is to present a work-time model for engineers. Engineers accomplish tasks by using their time when working on engineering or construction projects. Traditional project management records only work ...
    Request PDF

    On-Call Contracting Strategy and Management 

    Source: Journal of Management in Engineering:;1998:;Volume ( 014 ):;issue: 004
    Author(s): Andrew Shing-Tao Chang; C. William Ibbs
    Publisher: American Society of Civil Engineers
    Abstract: The purpose of this paper is to present an on-call contracting process model. On-call contracting is a strategy in which the owner initially signs a master contract with one party for a project and then divides the project ...
    Request PDF

    Engineering Information Classification System 

    Source: Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 004
    Author(s): Andrew Shing-Tao Chang; Ya-Wen Tsai
    Publisher: American Society of Civil Engineers
    Abstract: A good information classification and coding system is of great advantage to management. However, until now there has been no such a system for engineering management. MasterFormat is widely accepted as a construction ...
    Request PDF
    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian
     

    Author

    Publisher

    Year

    Type

    Content Type

    Publication Title

    DSpace software copyright © 2002-2015  DuraSpace
    نرم افزار کتابخانه دیجیتال "دی اسپیس" فارسی شده توسط یابش برای کتابخانه های ایرانی | تماس با یابش
    yabeshDSpacePersian